SELL BLCO
QUALITY/ PRODUCT: Nigerian Light Crude Oil, NNPC Export Standard.
QUANTITY: The quantity to be delivered for Buyers Q&Q in DESTINATION PORT shall be ONE TWO MILLION (1 - 2,000,000) BARRELS +/- 5% initial delivery, followed by ONE - TWO MILLION (1 - 2,000,000) BARRELS +/- 5% SHIPMENT PER MONTH FOR 12 MONTHS on mutual agreement.
TOTAL QUANTITY: 120,000,000 barrels
PRICE DISCOUNT: The price shall be calculated in barrels. The price to be paid shall be based on the Buyers Inspector Report of survey of Quantity and Quality (Q&Q) of the Light Crude Oil for each shipment based on standard out-turn Barrel by SGS or its Equivalent at destination port.
Gross price US$10.00 per barrel and Net price US$6.00 per barrel
PAYMENT INSTRUMENT: Buyers Bank shall issue a STAND BY LETTER OF CREDIT SBLC VIA SWIFT MT760 in favour of Sellers nominated Account as logistics funds & WITH MT103 SWIFT WIRE TRANSFER FOR FINAL PAYMENT after Q&Q in DESTINATION PORT.
DISCHARGING PORT(S): CIF price CIF China, Indian, Singapore, Australia, Asia
PAYMENT BY: Telegraphic wire transfer (MT103) within 3-5 days of delivery at discharge port.
COMMISSION: buyer pays Two US Dollar ($2.00) per barrel to both buyer / seller brokers & facilitators, per the separated IMFPA (Irrevocable Master Fee Agreement)
The Seller side is closed. The buyer side 2 USD per bbl is open.
CIF PROCEDURE SBLC
1. Contract to be signed between the seller and buyer and copies send to their banks.
2. Buyer issues letter of readiness to the NNPC through the seller and upon confirmation of readiness letter from buyer by seller/NNPC, seller instruct the corporation (NNPC) to send a supply assurance letter to buyer.
3. US$10million BG/SBLC VIA SWIFT MT760 to be issued from buyer bank to seller nominated bank according to seller approved verbiage.
4. Full sets of shipping documents of loaded cargo in buyer name to be sent direct to buyer or by bank to bank shipment by shipment.
5. Buyer sends his full NOR/ETA/ ATB format and Inspector and Supercargo IDs. Seller issue MATB and invite buyer inspectors to board the vessel for Q&Q
6. 100% conditional payment instrument via MT103/72 to be issued from buyer bank to seller nominated bank.
7. Cargo is unloaded into buyer storage tank and CIQ inspection is concluded. Seller issue cargo documents and invoice to buyer based on CIQ result.
8. Buyers Bank pays for the full cargo to Sellers bank via MT103 Swift Wire Transfer and simultaneously pay commissions to all Agents/Facilitators on this SPA, against Original copies of all relevant Cargo documents, including certificate of ownership and vessel Charter Party Agreement in Buyers name.
9. Next shipment continues as shall be mutually agreed, subject to prevailing price.
Supplier: Nnpc gas products such as blco, en590 diesel, lpg, lng, a7 aluminum ingot, iron ores, minerals, steam coal, sugar, white rice, long grain rice, japnoica rice, jasmine rice
* Quantity : MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyers bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Sellers fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 1,000,000 Barrels x 12 months with R/E * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. *Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 1,000,000 Barrels x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. Contract: 12 Months with possible rollovers. Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. 8 B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Product Description : BLCO contain 17 product iterms Price of product ( USD price or FOB price) : FOB USD 13/4, CIF USD10/4, per barrel. Product origin : Nigeria Key Specifications/Special Features : NNPC STANDARD NNPC TECHNICAL SPECIFICATIONS: SPECIFIC GRAVITY: 0.8398 API AT 60 DEG. F: Min 34.00 5% (ASTM D-1298) WATER CONTENT BY DISTILLATION: 0.2% (ASTM D-4006) POUR POINT DEGREES F: BELOW 40 (ASTM D-97) SULFUR WEIGHT %: 0.14 (ASTM D-139) SALT CONTENT PARTS PER BILLION: 3.0 (ASTM D-526) REID VAPOR PRESSURE (P.S.I.G.): 6.52 (ASTM D-529) KINEMATIC VISCOSITY @ 30 DEG. C: 2.2 (ASTM D-523) DISTILLATION INITIAL BOILING POINT (IBP): 35 DEG. C (ASTM D-86) DISTILL TO 75 DEG. C VOL.%: 7.0 DISTILL TO 175 DEG. C VOL.%: 35.5 DISTILL TO 250 DEG. C VOL.%: 51.5 DISTILL TO 300 DEG. C VOL%: 60.5 COLOUR Dark Brown Minimum Order Size and Packgaing details : 2 Million, 4 Million and 10 Million Barrel, Minimum 2 Million barrel Vessel per month.