MOQ TRIAL ORDER: 10,000/30,000 PER METRIC TONS MAIN ORDER : 100,000 Per MT x 12MONTHS (R+E) PAYMENT TERMS: TRANS-DLC/SBLC, MT103 TT WIRE TRANSFER 48 HOURS AFTER DIP TEST. PARTIAL SHIPMENT: NOT ALLOWED LOADING PORT: ROTTERDSM or KAZAKHSTAN SEA PORT OR OTHERS PORT. DESTINATION: ANY PORT INSPECTION: SGSâ?? AT THE PLACE OF LOADING PERFORMANCE BOND: THE SELLER PAYS A PENALTY OF 2% OF THE ORIGINAL QUANTITY TO THE BUYER IF THE PRODUCT DOES NOT ARRIVE WITHIN 60 DAYS PERFORMANCE BOND: SELLER ISSUES 2% AND NO PB IN TRIAL (AND 2% PB IS AVAILABLE OVER 100,000 PER METRIC TON)