Climbing Conveyor Minimum Order Quantity: 10 square meters Processing Cycle: 3 days for finished products, 15 days for customization Delivery Method: nationwide logistics distribution, door-to-door delivery. Delivery Time: 3-20 days The conveyor belt is made of some decorative material added to the common conveyor belt, so as to deepen the slip resistance of the conveyor belt and avoid the sliding and overflow of the conveyor belt when conveying products. This enables the conveyor belt of Climbing conveyor to be used normally, but in different industries, the conveyor belt is used in 40-90 Angle transport aircraft, which can save production space and also carry out material transportation in complex environment. The requirements for the conveyor belt are also different, which requires that the conveyor belt be processed and customized to make it suitable for its own machine.