== SOP for Ansell-C == == Key point: just only DLC== (1) Buyer: LOI, LOA, ICPO, NCNDA if intermediate company involved, POF if required within 1 day (2) Seller: FCO (3) Buyer signs FCO (4) Sign SPA (5) After signing SPA, seller provides PI Buyer provides Draft LC (6) Buyer issues first handed 100% Irrevocable Transferable Divisible LC at sight within 3 days (7) LC needs to be open within 3 days (8) SGS inspection at buyer's cost and application (9) After SGS, LC negotiated on the invoice value immediately