Gravel (Stone chips) obtained by breaking in various sizes are collected from 4 pieces of dosage silos into a collector band in desired amount through the bands. The speeds of the feeding belts which are located underneath of 4 pieces dosing silos can be set from the of frequency control panel.
Materials are moved into a mixer through these bands, moisturized by adding water and then obtained a homogenous and compressible mechanical material. Mixed and moistened material collected in loading silo through a band. There are 2 pieces of pneumatically controlled covers in loading silos in order to load the trucks fast.
Please ask detailed and specific
questions about Pricing, Minimum Order Quantity, Delivery Timelines etc. Detailed Messages
result in prompt responses.