Hebei Chengde Shengfeng Steel Shut Down on September 30 On September 23, Chengde Shengfeng Steel released an announcement, stating that all the equipment will shut down on September 30. According to the Capacity Replacement Plan released on November 26, 2019, the production capacity of Hebei Shengfeng Steel will be transferred to Guangxi and Guangdong Province. Founded in 2014, Chengde Shengfeng Steel possesses two 650m3 blast furnaces with iron-making capacity of 1.49 million tons and two 50t converters with steel-making capacity of 1.7 million tons. The main products are billet and HR strip and the output of HR strip reduces by around 4,000 tons per day after shut down.