Introduction of main components: 1. Standard 2. Ledger 3. Diagonal brace 4.Base jack 5. U-head jack 6. Split the ladder Six advantages of the Scaffolding: 1.Safe 2.Save material 3.Save energy 4.Being artistic 5.More effective 6.Environment protection Application: Highway Overpass Subway Airport High building viaductor bridges tunnel engineering generating station Workshop Overpass Warehouse shelf Chimney Water tower Large stage Characteristics: 1.Multipurpose 2.Less structures, easy to operate 3.High economy 4.Easy wedge to connect 5.High loading capacity 6.Being safe and reliable
Sensaji Scaffolding is a leading Scaffolding Pipes supplier, and exporter in Jodhpur, Rajasthan. Scaffolding pipes are essential components in primary parts and components of any scaffolding structure or formwork,
Cup-lock scaffolding system Cup-lock scaffolding system is a multi-purpose system scaffold, suitable for access and formwork support in all types of construction of building & civil engineering projects. Components: *cup-lock standard with spigots, cup-lock ledger, diagonal brace, intermediate transom Base jack, metal plank or catwalk Product feature: -simple. Components allow the easy creation of cantilevers, inside platforms and stair cases. -lighter. 20% lighter than coupler & pin scaffolding system -safe to erect and use Size Standard Length(m) Weight(kg) Self finish Painted Hot galv. L=0.50 2.42 2.5 2.57 L=1.00 4.84 4.98 5.13 L=1.30 6.54 6.74 6.93 L=1.50 7.25 7.47 7.69 L=1.80 8.96 9.22 9.49 L=2.00 9.67 9.96 10.25 L=2.30 11.37 11.71 12.05 L=2.50 12.08 12.44 12.81 L=3.00 14.5 14.93 15.37 Ledger Length(m) Weight(kg) Self finish Painted Hot galv. L=0.60 2.38 2.45 2.52 L=0.90 3.44 3.55 3.65 L=1.00 3.8 3.91 4.03 L=1.20 4.51 4.65 4.78 L=1.30 4.87 5.01 5.16 L=1.50 5.58 5.75 5.91 L=1.80 6.65 6.85 7.05 L=2.00 7.36 7.58 7.8 L=2.50 9.14 9.41 9.69 Intermediate transom Length(m) Weight(kg) Self finish Painted Hot galv. L=0.60 3.59 3.7 3.8 L=0.90 4.66 4.8 4.93 L=1.00 5.01 5.16 5.31 L=1.20 5.72 5.9 6.07 L=1.30 6.08 6.26 6.44 L=1.80 7.86 8.09 8.33 L=2.00 8.57 8.83 9.08 L=2.50 10.5 10.66 10.97 L=3.00 12.13 12.46 12.86
Scaffolding.
Scaffoldings, formworks, post shores, scaffolding accessories.
Process: forging process Material: carbon steel, 45# steel Oem: yes Application: scaffolding connection, formwork fixtures Quality: exporting standard Market: germany
Wall anchor use for holding & fasten a scaffolding structure to a building.
Base jack for scaffolding 42.7 / 34 *600mm
We are manufacturer, supplier and exporter of Scaffolding Bottom Cup with various specifications.It is fabricated with 4 to 5 MM thick sheet of mild steel. Available Weights:- 180 Grms to 230 Grms
Scaffolding Universal Clamp is made from Iron or Steel and used in building construction & engineering industries for various applications. The offered weight of the clamp is 380 to 525 Grms.
Tube od:1.62" high tensile steel; Finishing: powder coated; Frame size can be made per client't requirement.
Six advantages of the Scaffolding: 1.Safe 2.Save material 3.Save energy 4.Being artistic 5.More effective 6.Environment protection Application: Highway Overpass Subway Airport High building viaductor bridges tunnel engineering generating station Workshop
Adto ring-lock scaffolding system consists of hot dipped galvanized steel pie and modular components that are assembled together using integral wedge connectors. Adto ring-lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance. Components: Ring-lock standard with spigot, ring-lock ledger, ring-lock diagonal, wedge pin, base collar, steel plank, steel stair case. Feature: 1.Time efficient during assembly and dismantling 2.Safe and simple one-man assembly 3.No loose parts 4.Maintenance free Ringlock standard with spigot (48.3mm x 3.2mm, q345, hot dipped galvanized) Description Weight/ length Ring-lock standard 500mm 2.76kg Ring-lock standard 1000mm 5.18kg Ring-lock standard 1500mm 7.61kg Ring-lock standard 2000mm 10.03kg Ring-lock standard 2500mm 12.45kg Ring-lock standard 3000mm 14.87kg Ring-lock standard 4000mm 19.72kg Ringlock ledger (48.3mm x 3.0mm, q235, hot dipped galvanized) Description Weight/ length Ring-lock ledger 1000mm 4.62kg Ring-lock ledger 1500mm 6.50kg Ring-lock ledger 2000mm 8.38kg Ring-lock ledger 2500mm 10.27kg Ring-lock ledger 3000mm 12.16kg Ringlock diagonal (48.3mm x 3.2mm, q235, hot dipped galvanized) Description Weight/ length Ring-lock diagonal 1000x2000mm 10.06kg Ring-lock diagonal 1500x2000mm 10.95kg Ring-lock diagonal 2000x2000mm 12.13kg
Scaffolding and formwork and accessories.
concrete formwork slab shoring system for construction We are supplier of shoring formwork for concrete construction. Our company do scaffolding and formwork shoring business more than 20 years,we exported to almost all of the world. We have a patent products: Panel-Prop Early Stripping System.The technology is from Canada,we got invention patent in USA,Australia,and registered brand in USA,Canada and European Union. It includes only panel and prop, Erection and removal are very simple.Average erection or dismantling production speed per man-day is 100M2.We have confidence that it's the most advanced and fastest Early Stripping Shoring System in all of the world.
All kind of scaffolding and formwork.
Scaffolding and formwork products.
Scaffolding, formwork accessories, forging.
Scaffolding, formwork, climbing systems and safety systems.
EN39/EN10219/Scaffolding Pipe 1.Outer diameter: 48.3mm, wall thickness: 3.2mm/4.0mm, Pipe length:1.5ft,8ft,10ft,13ft,16ft. 2.SRL: 3-5.8m DRL: 10-11.8M or as clients requested length 3.Fixed length (5.8, 6, 12m) 4.Standard EN39,EN10219,BS1139,JIS G3444 5.Material S235J0H,S355J0H,Q235L Q345L,STK400,STK500 6.Ends: Plain ends 7.Surface treatment: hot-dipped galvanized Package: 1.Waterproof plastic cloth 2.Woven bags 3.PVC packing 4.Steel strips in bundles 5.As requirement Applications 1.scaffolding and formwork system 2.For construction 3.ringlock scaffolding 4.scaffolding system Payment and trade terms 1.Payment terms: T/T and L/C 2.Trade terms: FOB/CFR/CIF 3.Minimum quantity of order: 5MT (5000kg) Delivery time: 1.Usually, within10-20 days after receiving your down payment 2.According to the order quantity Test:Chemical component analysis, mechanical properties, technical properties, exterior size inspection, hydraulic testing , X-ray test Advantages: 1.Reasonable price with excellent quality 2.Abundant stock and prompt delivery 3.Rich supply and export experience, sincere service 4.Reliable forwarder, 2-hour away from port