Iron ore
Quantity for initial spot 12,500 Delivery Terms FOB Price for initial spot $77.00 usd per Metric Ton Time frame 30 to 40 days load spot cargo 1 Month for following cargoes
Density: Minimum of 62% Values and sizes: CHEMICAL COMPOSITION (on dry basis) Fe: 62% minimum Al2O3: 2.20%, greater than or equal to 3.0% rejection SiO2: 3.20%, greater than or equal to 7.0% rejection P: 0.04%, greater than or equal to 0.05% rejection S: 0.04%, greater than or equal to 0.09% rejection Fe: 2.40%, greater than or equal to 5% rejection K, Na, Pb, Zn, As, Ti:
Iron Ore 62% Fe + 50,000 MT per Month Annual renewable Direct with a supplier (miner) 3 to mesh
American Galvanized Bucket
Cable and wire, iron ore, aluminum, copper, steel.
Iron ore, sugar, chemicals, avocado oil, raw materials .Trading, export and import
Iron ore.
Iron ore.
Iron ore.
Iron ore 64% 100, 000 tm.
Iron ore.Team seller
Mexican iron ore.
Iron ore.
Iron ores.
iron ore.
Iron ore.
Soft iron ore.
Iron ore.
Metal crafts, wrought iron furniture, home & dTcor.