(24) New 2012 Bridgestone 59/80R63 VRF E1A E3 (12) New 2015 Goodyear 53/80R63 RM4A+ 5S (18) New 2017 Michelin 50/80R57 XDR 250 B4 (4) New 2018 Michelin 50/80R57 XDR 250 B4 (24) New 2018 Goodyear 46/90R57 RM4A+ 4S (24) New 2017 Goodyear 40.00R57 RM4A+ 4S (18) New 2018 Goodyear 40.00R57 RL4B 2S (12) New 2018 Michelin 40.00R57 XDR3 MB4 (12) New 2018 Michelin 40.00R57 XDR3 MB4 (10) New 2018 Goodyear 3700R57 RM4A+ 4S (12) New 2017 Bridgestone 3700R57 VZTS E2A (12) New 2011 Bridgestone 3700R57 VZTS E2A (12) New 2011 Michelin 3700R57 XDR B4 (22) New 2005/2006 Goodyear 3600-51 HRL 58Ply (12) New 2017 Goodyear 3300R51 RM4A+ 4S (21) New 2010 Goodyear 3300R51 RL4J 4S (48) New 2012-2013 Bridgestone 3300R51VRLS E1A (10) New 2018 Goodyear 2700R49 RM4A+ 3S (24) New 2018 Bridgestone 2700R49 VMTP E2A (24) New 2017 Bridgestone 2700R49 VREP E2A (24) New 2013 Titan 2700R49 007MFT 223B
(4) New 2012 Firestone 70/70-57 84 PLY SRG DT LD (3) New 2011/2012 Michelin 60/80R57 XMIN D2 (4) New Firestone 58/85-57 84PLY SRG DT LD (2) Goodyear 52/80-57 HRL D/L -4G L4 (4) New 2018 Goodyear 1150/65R45 RL5K (4) New 2018 Michelin 45/65R45 XLDD2 (8) New 2017 Bridgestone 45/65-45 D-Lug L5 58Ply (4) New 2017 Bridgestone 50/65-51 D-Lug L5 62Ply New Bridgestone 35/65R33 VSDL D2A 2* TU L5 New Bridgestone 35/65R33 VSNT DUH TLL L4
30 MW LM2500 Gas Turbine Power Plant Complete plant with (1) Two 30 MW LM2500 Gas Turbine, HRSG boiler with supplementary burner 10.5 KV, 50HZ, Turbine Year: 2007, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 12000 hrs., Borescope performed in 2016, Large amount of Spares come with Package, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
New Surplus (3) GE 40 MW 6B (HFO) Gas Turbines New Surplus Heavy Duty (3) GE 40 MW 6B Simple Cycle Heavy Fuel Oil Turbines with Warranty. The New surplus turbines are available due to a cancelled project and come with GE transferable warranty. The turbines are heavy duty and designed to run on heavy fuel oil, 11.5 KV, 3000 rpm, 50 HZ, Fuel: Heavy Fuel Oil (HFO) and Distillate Fuel Oil. These are complete turbines with all fuel systems, electrical systems, control systems, air systems, cooling systems compressor systems, starting system, Lubricating system, fire fighting system and much more.
105 MW Wartsila HFO Power Plant (7) 15.143 MW Wartsila 18 V 46 Four stroke, Direct Injected, Turbo Charged Heavy Fuel Engines and Generators, Commissioned 2001, 11000 V, 50 HZ, Engines were overhauled and have run between 400 hrs to 9000 hrs. Next overhaul is at 3000 to 11500 hours( depending on the engine) (3) Waste Heat Recovery Boilers:, Cooling system, Lube Oil system, Lubricating Oil System, Control and Monitoring System, Transformers, Electrical System, Pumps, Air System, Exhaust System, Compressed Air System, Tanks and much more. Plant can be purchased as a complete Turnkey Operation on your site if required.
46 MW LM6000 PC Sprint Gas Turbine Power Plant Complete plant with 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, 60 MT/HR (HRSG), Fuel: Natural Gas, 17,000 hrs. since overhaul, Year of commissioning 2006, 11.5 KV, 50 HZ, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
70 MW Wartsila Dual Fuel Power Plant This a complete plant that has Total Power:70840 K, Total Hot Water production :360 ton/h, Total Steam :35 ton/h, (6) six Wartsila Natural Gas and Dual Fuel Generator sets (4) 8730 kW Wartsila 20SV34SG Natural Gas Generator Sets, Year 2006 to 2009, 15000 to 40000 hours (2) 16650 KW Wartsila 50 DF Generator sets (Natural Gas, Light Fuel Oil & Heavy Fuel Oil) Year 2010, 11,000 running hours, 514 rpm, 50 HZ, Siemens Steam Turbine, Boilers, Cooling system, Lubricating Oil System, Control and Monitoring System, Electrical System, Transformers, Pumps, Air System, Exhaust Gas System, Compressed Air System, tanks and etc. The (2) 16650 KW Wartsila 50 DF Generator sets can be purchase separately from the rest of the plant.
31 MW GE LM2500+ Gas Turbine General Electric LM2500+HSPT 31132 kW, Commissioned in 2004, Natural Gas, Brush Generator rated at 47500 KVA, 50 HZ, 11500 V, can be upgraded to dual fuel system. Next overhaul hours are required after 3579 running hours. Turbine package can be put into service or used for spares for an already existing plant. This plant is reduced in price and is the most affordable LM2500 + on the market.
60 MW Wartsila Natural Gas Power Plant Consists of (6) 9730 KW Wartsila 20V34SG Natural Gas Engines and AVK Alternators, Fuel: Natural Gas, Year 2010/2011, 11 KV, 50 HZ, low running hours. Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
140 MW Wartsila Natural Gas Power Plant Complete Natural Gas Power Generation Plant in new condition with only 1300 hours of operation, equipment manufactured in 2011/2012. Plant has (13) 9730 KW Wartsila 20V34GS Natural Gas Reciprocating engines with AVK Alternators, Siemens Steam Turbines heat Recovery Boiler, 11 KV, 50 HZ, Fuel Natural Gas, includes all auxiliary equipment. Plant is being sold at a reduced price for quick sale.
95 MW Wartsila Natural Gas Power Plant Consists of (12) Wartsila 20V34SG Natural Gas Engines and ABB Alternators, Fuel: Natural Gas, Year 2005/2009, 11 KV, 50 HZ, Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
80 MW Pratt & Whitney FT8 Combined Cycle Power Plant Two (2) 29 MW Pratt & Whitney FT8-3 Swiftpack single shaft gas turbines with air cooled brush generators, Fuel: Natural Gas (NG), 3000 rpm, 50 HZ, Hours: 16,000 hrs, commission in 2010, (2) Steam turbines, transformers, condensers, electrical systems, control systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
200 MW Siemens SGT-800 Gas Turbine Power Plant Three (3) Siemens SGT 800 Gas Turbines, Siemens Steam Turbine, 3000 rpm, 50HZ, Commissioned Year: 2013, Total operating Hours, 21,000, Hours ran after last inspection 2500 hrs. (3) HRSG, RMS station, HV switchyard,, electrical systems, control systems, air systems, cooling systems, compressor systems, pumps, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
60 MW GE LM6000 PC Gas Turbine Power Plant 50 MW GE LM6000 PC gas turbine, Year of manufacture: 2011, Hours since new: 7000 hrs., 3000 rpm, 50 HZ, 13 MW Siemens SST 300 steam turbine, Year of manufacture: 2012, Hours since new: 5000 hrs, transformers, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, HV System, MV System, LV System, ABB Pumps, Demi Water Systems, fire fighting system and much more. Complete plant in new condition, can be inspected in operation.
120 MW LM6000 PC Gas Turbine Power Plant 120 MW LM6000 combined cycle power plant consists of ( 2) 47 MW LM6000 PC Gas Turbines, Year 2007, 50 HZ, 11.5KV. HRSG, Steam Turbine, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, demineralization unit, switch room, transformers, pumps and much more. The LM6000 PC gas turbine power plant is a complete plant that has been well maintained since installation on site. Can be seen in operation.
Power Purchase Agreement (PPA) Power Projects We provide affordable solutions for your energy needs by providing a secure and stable power supply through a Power Purchase Agreement (PPA) contract, where we build, own and operate (BOO) small to medium size power plants and sell the power to your facility at a very competitive rate. Contact us
Joint Venture Agreements (JVA) Power Projects We provide solutions to equipment owners in joint venture agreements by purchasing existing power plants that are operating marginally or at a loss and entering in to a profit sharing arrangement with the power plant owner. Contact us
80 MW LM2500 + Dual Fuel Gas Turbine Power Plant Complete plant with (2) Two 30 MW LM2500 + Gas Turbines, (2) Two Steam Turbines, HRSG (Heat Recovery Steam Generators), 11 KV, 50HZ, Plant installed in 2005, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 3700 hrs. & 5000 hrs., (3) Transformers, condensers, electrical systems, control systems, cooling systems, compressor systems, starting system, lubricating system, fire fighting system and much more. Complete package, very well maintained.
52 mw man diesel hfo complete power plant (7) 7600 kw man 16v32/40 sixteen-cylinder four-stroke, turbocharged and charge-air cooled engines, (7) heavy duty generators, year 2001, 750 rpm, 50 hz, only 7, 000 hours since installation, cooling system, lube oil system, lubricating oil system, control and monitoring system, electrical system, heavy fuel oil system, heavy fuel oil purification system: pumps, air system, exhaust gas system, compressed air system, heat recovery system, steam distribution system, boilers, transformers, tanks, tank farm equipment , water treatment, reverse osmosis system, desox system, start up boiler, fire fighting system, discharge pumps, water pumps, forced draft ventilation system, black-start-diesel generating set, piping, power house crane, hoist equipment and tools and spares. This is a complete plant that can be purchased a very good price.
New surplus (3) ge 40 mw 6b (hfo) gas turbines New surplus heavy duty (3) ge 40 mw 6b simple cycle heavy fuel oil turbines with warranty. The new surplus turbines are available due to a cancelled project and come with ge transferable warranty. The turbines are heavy duty and designed to run on heavy fuel oil, 11.5 kv, 3000 rpm, 50 hz, fuel: heavy fuel oil (hfo) and distillate fuel oil. These are complete turbines with all fuel systems, electrical systems, control systems, air systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more.