95 MW Wartsila Natural Gas Power Plant Consists of (12) Wartsila 20V34SG Natural Gas Engines and ABB Alternators, Fuel: Natural Gas, Year 2005/2009, 11 KV, 50 HZ, Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
80 MW Pratt & Whitney FT8 Combined Cycle Power Plant Two (2) 29 MW Pratt & Whitney FT8-3 Swiftpack single shaft gas turbines with air cooled brush generators, Fuel: Natural Gas (NG), 3000 rpm, 50 HZ, Hours: 16,000 hrs, commission in 2010, (2) Steam turbines, transformers, condensers, electrical systems, control systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
200 MW Siemens SGT-800 Gas Turbine Power Plant Three (3) Siemens SGT 800 Gas Turbines, Siemens Steam Turbine, 3000 rpm, 50HZ, Commissioned Year: 2013, Total operating Hours, 21,000, Hours ran after last inspection 2500 hrs. (3) HRSG, RMS station, HV switchyard,, electrical systems, control systems, air systems, cooling systems, compressor systems, pumps, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
60 MW GE LM6000 PC Gas Turbine Power Plant 50 MW GE LM6000 PC gas turbine, Year of manufacture: 2011, Hours since new: 7000 hrs., 3000 rpm, 50 HZ, 13 MW Siemens SST 300 steam turbine, Year of manufacture: 2012, Hours since new: 5000 hrs, transformers, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, HV System, MV System, LV System, ABB Pumps, Demi Water Systems, fire fighting system and much more. Complete plant in new condition, can be inspected in operation.
120 MW LM6000 PC Gas Turbine Power Plant 120 MW LM6000 combined cycle power plant consists of ( 2) 47 MW LM6000 PC Gas Turbines, Year 2007, 50 HZ, 11.5KV. HRSG, Steam Turbine, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, demineralization unit, switch room, transformers, pumps and much more. The LM6000 PC gas turbine power plant is a complete plant that has been well maintained since installation on site. Can be seen in operation.
Power Purchase Agreement (PPA) Power Projects We provide affordable solutions for your energy needs by providing a secure and stable power supply through a Power Purchase Agreement (PPA) contract, where we build, own and operate (BOO) small to medium size power plants and sell the power to your facility at a very competitive rate. Contact us
Joint Venture Agreements (JVA) Power Projects We provide solutions to equipment owners in joint venture agreements by purchasing existing power plants that are operating marginally or at a loss and entering in to a profit sharing arrangement with the power plant owner. Contact us
80 MW LM2500 + Dual Fuel Gas Turbine Power Plant Complete plant with (2) Two 30 MW LM2500 + Gas Turbines, (2) Two Steam Turbines, HRSG (Heat Recovery Steam Generators), 11 KV, 50HZ, Plant installed in 2005, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 3700 hrs. & 5000 hrs., (3) Transformers, condensers, electrical systems, control systems, cooling systems, compressor systems, starting system, lubricating system, fire fighting system and much more. Complete package, very well maintained.
New surplus (3) ge 40 mw 6b (hfo) gas turbines New surplus heavy duty (3) ge 40 mw 6b simple cycle heavy fuel oil turbines with warranty. The new surplus turbines are available due to a cancelled project and come with ge transferable warranty. The turbines are heavy duty and designed to run on heavy fuel oil, 11.5 kv, 3000 rpm, 50 hz, fuel: heavy fuel oil (hfo) and distillate fuel oil. These are complete turbines with all fuel systems, electrical systems, control systems, air systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more.
80 MW LM2500 + Dual Fuel Gas Turbine Power Plant Complete plant with (2) Two 30 MW LM2500 + Gas Turbines, (2) Two Steam Turbines, HRSG (Heat Recovery Steam Generators), 11 KV, 50HZ, Plant installed in 2005, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 3700 hrs. & 5000 hrs., (3) Transformers, condensers, electrical systems, control systems, cooling systems, compressor systems, starting system, lubricating system, fire fighting system and much more. Complete package, very well maintained.