Pipe clamp, carbon steel clamp
Ms flat bars & shuttering clamps
Stainless-steel-hose-clamps
Stainless steel clamp
Saddle clamp for stainless steel 316
Brass clamp clip, steel clamp clip
Steel clamps, hangers and gaskets,gaskets,steel clamps,steel hangers
Stainless steel repair clamps for water pipelines
Please provide a quotation to the following requirement from importer - Product : Steel Plate Carbon, Hot Rolled, Alloy Specifications: STRUCTURE ANNEALED (LENGTH= 1000MM+ 10/-0) X WIDTH (180 MM + 5/-0) XTHICK (6MM ± 0.30MM) NO.35 Cr. Mn SiA CHEMICAL COMPOSITION C=0.32-0.39% Si=1.10-1.40% Mn=0.80-1.10% Cr-1.10-1.40% P=Max 0.025% S=Max 0.025% Cu= Max 0.25% Ni = 0.30% MECHANICAL PROPERTIES Tensile strength=600-800(MPa) Elongation = 16% Min Quantity: 30,400 Kg. ITEM # 2: STEEL PLATE CARBON, HOT ROLLED, ALLOY STRUCTURE ANNEALED (LENGTH= 1000MM+ 10/-0) X WIDTH (180 MM + 5/-0) XTHICK (6MM ± 0.30MM) NO.35 Cr. Mn SiA CHEMICAL COMPOSITION C=0.32-0.39% Si=1.10-1.40% Mn=0.80-1.10% Cr-1.10-1.40% P=Max 0.025% S=Max 0.025% Cu= Max 0.25% Ni = 0.30% MECHANICAL PROPERTIES Tensile strength=600-800(MPa) Elongation = 16% Min Quantity: 35,700 Kg. SPECIAL CONDITIONS: To be followed by Shipper/Maker; 1. Same (Single) competitive Unit Rate must be quoted against the same tendered items. 2. Full Qty falling in both inspection authorities must be quoted otherwise offer will be ignored. 3. Sample to be provided by the firms within 15 x days of technical opening except last Supplier, 4. Validity of offer at least 90 days (Extendable if required) would be considered w.e.f commercial opening of tender (s) after acceptance of technical offers 5. Conditional offers are likely to be ignored. 6. Needful supporting technical literature/ Catalogue/ Brochure against each tender it must accompany technical quotation if requisite/relevant technical literature found missing, quotation will be considered rejected. 7. Performance Bond (in shape of CDR/B.G) should be provided against L.O.I for issuance of formal contract. However, 20 The supplier will render a Warranty / Guarantee Certificate for a period of 12 x months from final acceptance of store 21 Protocol of inspection will be followed as per inspection authorities. Further requirements: · Supplier type: manufacturer 35 tons approx Quantity Required : 35 Ton/Tons Shipping Terms : CIF Destination Port : Pakistan, Pakistan Payment Terms : LC Looking for suppliers from : Worldwide Contact : Rashid Akhtar
4" v ban clamps stainless steel and ( 6 pieces) 3".
Pipe clamps, hose clamps
Pipe Clamps
Truss, barrier, clamp
Pipe clamps
Stainless steel pan clamp and pressure cooker flameguard
Tube And Pipe Fittings Steel Clamps
Pipe clamps
Cable support systems: cable trays, cable ladders, cable clamps, underfloor trunking systems, pipe systems, special products
Pipes and fittings like couplings, clamps
Clamps, cross arms, top hamper, strut channel, steel structure, eye took, transformer bed structure