Safety matches
Safety matches and other categories
Marine, industrial and security retial
Ppe safety products
Infrared forehead thermometer
Paint, food products, safety matches, mosquito coils, sanitary gates/products, industrial equipment, hand printed fabric, cement, timber
Brass Furniture Fittings, Building Hardware, Kitchen Accessories, Bathroom Accessories
The buyer would like to receive quotations for - Product Name: Antimony Ore Specifications: Origin: Nigeria Qty: Trial quantity: 1,000mt Monthly quantity: 50,000mt Price: $2150 Contract period: 12 months Performance bond: 2% Commissions: $50 Specifications: Standard Sb 60% min. A. (the Stibi has 60 degrees up) Applications: Used in addition to current raw materials Others: Specification : - Size 0-6 inch. - Sb 50%min. Fe 0.3%max. - As 0.3%max. Pb 0.4%max. - Se 70 ppm max. Bi 70 ppm max. - S 23%max. Moisture 4.0%max. Procedure: 1. Buyer sends LOI 2. Seller send FCO 3. Buyer returns signed FCO 4. Intermediaries sign IMFPA 5. Seller sends draft SPA 6. Buyer returns signed draft SPA 7. Seller issues proforma invoice 8. Buyer returns signed proforma invoice 9. Within fifteen (15) banking days after the proforma invoice is signed, the buyers bank issues an irrevocable confirmed non-transferable DLC MT700, valid for sixty (60) days, in the amount of 100% of the product value. 10. Within five (5) bank days after the confirmation and receipt of the DLC MT700, the seller's bank will issue a 2% performance bond (value of the shipment value). 11. The seller will provide dates for loading. Loading must start within 20/25 days after confirmation of the seller’s bank receiving and confirming of the buyers DLC. 12. Within 76 hours after loading is complete and the buyer receiving all the required shipping documents, the buyer's bank will pay to the seller’s bank via MT700. 13. After the goods arrive at the destination port and discharged to the dock, the buyer is required to start the inspection within two (2) days. Within five (5) working days after the buyer receives the analysis report and the result matches the detail quantity and quality, the buyer's bank will issue an irrevocable confirmed non-transferable DLC MT700 valid for sixty (60) days, in the amount of 100% of the next shipment value. 14. From the second monthly order onwards, the buyer's bank is required to issue the DLC for next batch of goods five (5) days in advance of the current batch of goods arrival at destination port. 15. This process will continue until the completion of the terms of the contract. Packaging Terms : 1,000kgs Flexible Container-Bag Quantity Required : 50000 Metric Ton/Metric Tons Shipping Terms : CIF Destination Port : Aswp, Other-Not Shown Payment Terms : Guarantee: Non transferable DLC Payment: TT or MT103 Payment timing: At origin against shipping documents Looking for suppliers from : Worldwide Contact : Yasu
The buyer would like to receive quotations for - Product: Phosphate Rock Specifications: Origin: Nigeria Specifications: Minimum phosphate value: 30% Loading port: Apapa Port, Lagos, Nigeria Qty: Monthly quantity: 100,000mt Price: $135 per metric ton Procedure: 1. Buyer sends LOI 2. Seller send FCO 3. Buyer returns signed FCO 4. Intermediaries sign IMFPA 5. Seller sends draft SPA 6. Buyer returns signed draft SPA 7. Seller issues proforma invoice 8. Buyer returns signed proforma invoice 9. Within fifteen (15) banking days after the proforma invoice is signed, the buyers bank issues an irrevocable confirmed non-transferable DLC MT700, valid for sixty (60) days, in the amount of 100% of the product value. 10. Within five (5) bank days after the confirmation and receipt of the DLC MT700, the seller's bank will issue a 2% performance bond (value of the shipment value). A 11. The seller will provide dates for loading. Loading must start within 20/25 days after confirmation of the seller’s bank receiving and confirming of the buyers DLC. 12. Within 76 hours after loading is complete and the buyer receiving all the required shipping documents, the buyer's bank will pay to the seller’s bank via MT700. 13. After the goods arrive at the destination port and discharged to the dock, the buyer is required to start the inspection within two (2) days. Within five (5) working days after the buyer receives the analysis report and the result matches the detail quantity and quality, the buyer's bank will issue an irrevocable confirmed non-transferable DLC MT700 valid for sixty (60) days, in the amount of 100% of the next shipment value. 14. From the second monthly order onwards, the buyer's bank is required to issue the DLC for next batch of goods five (5) days in advance of the current batch of goods arrival at destination port. 15. This process will continue until the completion of the terms of the contract. Quantity Required : 100000 Metric Ton/Metric Tons Shipping Terms : FOB Destination Port : Other-Not Shown Payment Terms : Guarantee: Non transferable DLC Payment: MT103/TT Payment timing: Origin against shipping documents Looking for suppliers from : Nigeria Contact : Yasu
Leather Goods, Fashion Apparel (men, Women, Kids), Home Furnishings, Kitchenware/Houseware, Safety Products, Vintage Furniture
Nitrile gloves, latex gloves, vynil gloves, kn95 face masks, 3 ply face masks, kf94 face masks, 3m respirators, n95 face masks, isolation gowns, surgical gowns, head cups/hair nets, shoe covers, boot covers, coveralls, face shields, googles, covid 19 test kits
Matching horse tack sets