Very small and small hydro turbines, grid synchronizing systems for hydro turbines
New surplus (3) ge 40 mw 6b (hfo) gas turbines
Used 4 5 mw back pressure steam turbine
Turbines, bioler
Required steam turbine for alternator drive with inlet steam condition of 43kg/cm2g&420 deg c with exhaustpr.Of 2kg/cm2g.Turbine should have provision of bleed at 10 kg/cm2g at 4.5tph flow. Power required 1.5-1.8 mw
Turbine and its auxiliaries
Steam turbine
Components related the above.. And hydro-turbines
Turbine-suitable for canal based project, design head-2.4m, design discharge-70cumecs, installed capacity-2 x 700kw for two projects in haryana state & pelton turbines for 248m head, design discharge-1.08cumecs, installed capacity-2 x 1.00mw at chakshi in distt.
250 MW turbine boiler generator
Wind, solar & all types of renewable energy products and its components.
Turbine machines for power projects