Payment Terms:
100% Letter of Credit at sigh, Non-Transferable Terms
Destination:
South Korea (Republic Of Korea)
Looking for suppliers from:
Worldwide
Product Description
The buyer would like to receive quotations for -
Product Name: Used Rail Scrap And Steel Scrap
Specifications :
Commodity: ISRI Reail Scrap R50-R65 2nd Grade
Cut: Mandatory, 1~1.5m
Origin : Any
Source : Any
Loading Port : ASPW
Destination : Shanghai, China
Delivery : by Sea
Incoterms : 2020, CIF
Target Price : 230 USD per MT
MOQ : 100,000MT for 12month
Packing : Cut Lose Into 1.5m And Ship In Bulk
Payment : 100% Letter of Credit ,AT SIGHT, Non-transferable terms
Payable : 100% by TT/MT103 at Discharge Port, after buyer confirmation SGS, CIQ
P-Bond : 2% from seller after Buyer’s Against MT700 directly. Past performances Evidence is mandatory
Inspection : Loading Port by seller, Destination Port by Buyer.
A buyer(or mandate) can observe the inspection and shipment
Specification
ISRI-CODES:
(27) Rail, steel No.1 Standard section T rails, original weight 50 pounds per yard or heavier, 10 feet long and
Compositions:
Nominal Specification ;
Carbon (C) 0.20% to 0.60% Manganese (Mn) 0.60% to 0.90%
Silicon (Si) 0.15% to 0.35% Sulphur (S) 0.05% to Maximum
Phosphorous (P) 0.05% to Maximum Arsenic (Ar) 0.15% to Maximum
Nominal Specification for R65 – 64.72 kg/m GOST 8165-75;
Carbon (C) 0.40% to 0.58% Manganese (Mn) 0.75% to 0.88%
Silicon (Si) 0.13% to 0.28% Sulphur (S) 0.045% to Maximum
Phosphorous (P) 0.035% to Maximum Arsenic (Ar) 0.13% to Maximum
Nominal Specification for R65 – 64.72 kg/m GOST 8165-75;
Carbon (C) 0.40% to 0.58% Manganese (Mn) 0.75% to 0.88%
Silicon (Si) 0.13% to 0.28% Sulphur (S) 0.045% to Maximum
Phosphorous (P) 0.035% to Maximum Arsenic (Ar) 0.13% to Maximum
Non-compliance Penalty
The Seller Warrants To Pay All Charges Of Loss And Damage Incurred To The Buyer If The Seller Fails To Execute
The Loading Of Goods To The Destination Within The Specified Time To A Maximum Amount Not Exceeding 2%.
• The Buyer Warrants To Pay All Charges Of Loss And Damage Incurred To The Seller In Case He Fails To
Make The Ffdlc As Per The Payment Terms Of This Agreement Within The Specified Time TO A Maximum Amount Not Exceeding 2%..
• 2% Performance Bond Is Required In This
Quantity Required : MOQ
Shipping Terms : CIF
Destination Port : South Korea (Republic Of Korea)
Payment Terms : 100% Letter of Credit at sigh, Non-Transferable Terms
Payment Terms:
1) Trial shipment: By Irrevocable, Non-transferable, MT700DLC + T/T pay (by MT103) pay at discharge port after SGS (or Equivalent) 2) 2rd Last shipment: Irrevocable, Non-transferable, IRDLC + T/T pay (by MT103) at discharge port after SGS (or Equivalent)
Destination:
Incheon Port (Or Busan), South Korea, South Korea (Republic Of Korea)
Looking for suppliers from:
Worldwide
Product Description
Buyer is interested to receive quotations for the following RFQ -
Product Name: Copper Wire Scraps (Millberry Only)
Specifications
Copper Wire Scrap (Millberry only)
Refer to Appendix A Photos (Copper Scrap - Millberry) (Don't accept to mixture with other materials)
Demand Quantity (MT)
1) Trial Shipment: 100 to 200MT for Shipping Test
2) 1-12 times: 500 MT to 2,000 MT per month x 12 times
Discharge Port
Incheon port (or Pusan), South Korea
Payment Guarantee
1) Trial shipment: By Irrevocable, Non-transferable, MT700DLC + T/T pay (by MT103) pay at discharge port after SGS (or Equivalent)
2) 2rd Last shipment: Irrevocable, Non-transferable, IRDLC + T/T pay (by MT103) at discharge port after SGS (or Equivalent)
Performance Bond -2.0% after operative MT 700 DLC
Buyer's Target Price LME-20.0% (Net)/LME-23.0% (Gross)-CIF (or Seller's option)
London Metal Exchange (LME) Rate - The contracted goods on arrived date at discharge port-LME price: (Do not accepted to B/L date or Contracted date - LME price) CIF-term
Delivery Time
Inspection - 1)At loading port-it's cost shall be pay by Seller's account
2)At Discharge port- it's cost shall be pay by Buyer's account
Packing - 1,000 Kg-Poly bag (Don't accept to hydro-unit pressed)
Shipping Time : Within 20-25 days after payment guarantee confirmed.