FDA
120*140cm; 25gsmSPP+20gsmPE 10pcs/bag - 100pcs/ctn Min 20.000
63grams PPE+PE Gown AAMI4 - Thickening Or Seam Tape.
45gsm SMS 5pcs/bag - 50pcs/ctn Min. 20000 pcs
FDA/CE Knitted Cuff/Seam Tape 35gr Or 45gr PP,PE+Film or SMS
FDA/CE
FDA/CE
FDA/CE
FDA/CE
28g PP/M2 + 17g PE/M2 FDA EN :13795
FDA
Type: 1-layer S (Spunbond) material with fabric cuffs on the wrist, fastening straps at the neck and waist; antistatic; conditionally waterproof; Safety: It is the responsibility of the user to check whether this gown meets the requirements for hazardous substance and concentration. Color: white or blue Size: standard size XL
Type: 3-layer SMS material with fabric cuffs on the wrist, fastening straps at the neck and waist; antistatic; conditionally waterproof; Safety: It is the responsibility of the user to check whether this gown meets the requirements for hazardous substance and concentration. Colour: blue, other colours on request Size: standard size XL
Type: Protective suit Cat.3 type 5/6; Elastic cuffs on the wrist; antistatic; Safety: It is the responsibility of the user to check whether this gown meets the requirements for hazardous substance and concentration. Color white Size: standard size XL
Type: 2-layer S (Spunbond) material with fabric cuffs on the wrist, fastening straps at the neck and waist; antistatic; conditionally waterproof; Safety: It is the responsibility of the user to check whether this gown meets the requirements for hazardous substance and concentration. Colour: blue Size: standard size XL
Certification -Test report Daily manufacturer output - 1,000,000 pcs Price - $9.15
LEVEL D TYPE 4 -STROM.3 STR-2077 Protection against infectious agents and biological hazards * Water proof / Oil resistance * Moisture Permeable * resistance to Synthetic blood & viral penetration * Elastic wrist Breathable PE-Laminated in PET /PP Non-woven Weight : 60g/sm
raw material : type D Non surgical gown, for surgical gowns , please inform us ahead
1)STR-2031
approved CE and FDA, Polyester 44% + Polyethylene 56%, Rubber band cuff, AAMI-Level 3. Payment method: 30%T/T, 70%T/T or Negotiable Leading time : 9 Days for arranging raw material