Espresso machines, espresso capsules.
Our Kazakhstan private company "WTCA" buys TWO equipment (2 Different complete lines or 1 Universal complete line) for the production of Beverage bottle: I option. 1) MINERAL WATER (Cold filling) (maybe+carbonated-CO2) with capacity=3000 bottle/hour-0.5L; 2) ICE TEA (Hot filling) with capacity=3000 bottle/hour-0.5L (standard volume) (also 0, 3-1-1.5L). II option. If possible, make for us one whole line of Mineral Water and Ice Tea, since the area (placement-platform=look on the Drawing) for the future plant is small (Is one 1-line enough instead of two lines? ). Possible, 1 line will work by turns for each Drink=Beverage (for example: 1 day-Mineral Water, 2 day-Ice Tea). We have Two underground water wells in this section of the future plant (see drawing! ), where First Well has depth of 1280 m (Mineral water) and Second well has depth of 120 m (simply underground water). Accordingly, we will use water from both wells (It's should have a Water Protection Sanitary Zone on idea) for the production of Mineral Water and Ice Tea. Company "World Trade Center Almaty" (WTCA) 42 Timiryazev str., Almaty, Kazakhstan, otcheg(at)mail(dot)ru
Beverage equipment, mineral water machine, filling machine.