Please click here to check who's online and chat with them.

Find Verified Building Construction Machineries And Equipments Suppliers, Manufacturers and Wholesalers

Jun-02-16
 
Quick Information
Brand Name: SHOUDE SD
Place of Origin: China
Model Number : SD-3006
item : German style Scaffolding
material : Q235
size : 48.3mm*48.3mm
weight : 1.50kg
finish : electroplate,zinc plate


Description


German style Scaffolding forged Swivel Coupler/clamp

1.Product Description

German style Scaffolding forged Swivel Coupler/clamp

1.Dimensions: 48.3mm

2.Meterial:Q235

3.Nut: 21mm,22mm,23mm

4.T-bolt:85mm,87mm,89mm

5.Weight : 1.5kg or as per your request

6.Standard:EN74,BS1139,CE and also fit for our demostic stardand , through SGS test.

7.Technic:Forged

8.Surface treatment:Self-color,Zinc plated ,Hot dip galvanised

9.Color:Self-color(Black) , White, Yellow

10.Style:British(also can produce German, American, Japanese and so on)

11.Quality:good bearing capacity,durable & stable

12.Price:reasonable & wonderful

13.OEM service is available.
Jun-02-16
 
1.Item: EN/BS standard scaffolding American forged double coupler /clamp

2.Origin:China mainland Shandong

3.material :Q235;


4.standard : EN74,BS1139

5.ISO 9001:2000 is approved;

6.OEM service is available.

7.type:American Type Double Coupler




Commodity name

EN/BS standard scaffolding American forged double coupler /clamp


Usage

Fixed Scaffold Pipe


Origin

ChinaMainland


Material

Q235


Process

Forging


Surface

Electro-galvanized


M.O.Q

2000PCS


Packing

Woven bags + steel pallet


Delivery time

20-25 days after order confirmation


Payment term

T/T, L/C, Western Union


Business type

Manufacturer and exporter


Certifications

SGS


Advantage

1.High Quality 2.Professional service 3.Competitive price


Notes

Special marks can be made according to customers requirements;




It is available to produce by customer drawing.


Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding system, shoring prop, formwork system, frame system, Accessories
Jun-02-16
 
Quick Details

Place of Origin:
Shandong, China (Mainland), Shandong, China (Mainland)
Brand Name:
SD-3012, SD
Model Number:
SD, SD-3012

Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
Item:
Forged American type swivel coupler

Material:
Q235
Size:
48.3*48.3mm
Weight:
1.70kg

Tecnic:
Forged
Finish:
Zinc Plate, Electroplate
Standard:
EN74, BS1139



Packaging & Delivery
Jun-02-16
 
Brand Name: SHOUDE SD
Place of Origin: China
Model Number : SD-1011
item : Steel plate italian Forge
Material : Q235
Size : 48.3*48.3 mm
Weight : 1.40KG
technic : pressed
Jun-02-16
 
1.Item: Scaffolding Sleeve Coupler/External Joiner

2.size:48.3mm;

3.material :Q235;

4.standard : EN74,BS1139

5.ISO 9001:2000 is approved;

6.OEM service is available.










Commodity name
Scaffolding Sleeve Coupler/External Joiner

Usage

Fixed Scaffold Pipe


Origin

China Mainland


Material

Q235


Process

Forging


Surface

Electro-galvanized


M.O.Q

2000PCS


Packing

Woven bags + steel pallet


Delivery time

20-25 days after order confirmation


Payment term

T/T, L/C, Western Union


Business type

Manufacturer and exporter


Certifications

SGS


Advantage

1.High Quality 2.Professional service 3.Competitive price


Notes

Special marks can be made according to customers requirements;




It is available to produce by customer drawing.


Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding system, shoring prop, formwork system, frame system, Accessories
3783 Building Construction Machineries And Equipments Suppliers
Short on time? Let Building Construction Machineries And Equipments sellers contact you.
Jun-02-16
 
Commodity name
Construction aluminium formwork tie rod

Usage

be used with wing nut


Origin

China Mainland


Material

Q235 or 45#steel


Process

cold rolled


Surface

Electro-galvanized,natural,HDG


M.O.Q

2000PCS


Packing

steel pallet


Delivery time

20-25 days after order confirmation


Payment term

T/T, L/C, Western Union


Business type

Manufacturer and exporter


Certifications

SGS


Advantage

1.High Quality 2.Professional service 3.Competitive price


Notes

Special marks can be made according to customers requirements;




It is available to produce by customer drawing.


Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System,

Kwikstage scaffolding system, shoring prop, formwork system, frame system, Accessories
Jun-02-16
 
Steel scaffolding plank,walking board



(1)materail:Q235



(2)surface treatment:Hot-dip galvanized



(3)Size: 200*76*1.8mm



(4)weight:as per size



(5)standard:BS1139,EN74



(6)OEM service is available



(7)Features:easy assemble ,durable and stable
May-06-16

Scaffold

$1.20 - $2.00
MOQ: Not Specified
Supplier From Jinan, Shandong Province, China
 
Product Description
1)Material: Q345,Q235 ect.
2)size: as request
3) Surface treatment:galvanized or black
4) Color: Silver color or as per customized.
5) Minimum Order Quantity: 1 ton
6)Delivery time within 30 days after received the deposit.
7)Certification:ISO 9001
Features:
1. Q235 cold-rolled steel,electrophoretic painting or galvanized
2. Adjustable or customers' sizes available dimension
3. Replacement of traditional timber scaffolding
4. No need of couplers/nails/timers,save cost, easy and fast to operate,need less labor
5. Environmental-friendly,promoted by government
6. Reused for 300 times,lower cost






In steel pallet
May-06-16

Scaffolding

$1.20 - $2.00
MOQ: Not Specified
Supplier From Jinan, Shandong Province, China
 
Product Description
1)Material: Q345,Q235 ect.
2)size: as request
3) Surface treatment:galvanized or black
4) Color: Silver color or as per customized.
5) Minimum Order Quantity: 1 ton
6)Delivery time within 30 days after received the deposit.
7)Certification:ISO 9001
Features:
1. Q235 cold-rolled steel,electrophoretic painting or galvanized
2. Adjustable or customers' sizes available dimension
3. Replacement of traditional timber scaffolding
4. No need of couplers/nails/timers,save cost, easy and fast to operate,need less labor
5. Environmental-friendly,promoted by government
6. Reused for 300 times,lower cost




In steel pallet
May-04-16
 
Introduction of main components:
1. Standard 2. Ledger 3. Diagonal brace 4.Base jack 5. U-head jack
6. Split the ladder

Six advantages of the Scaffolding:
1.Safe
2.Save material
3.Save energy
4.Being artistic
5.More effective
6.Environment protection

Application:
Highway Overpass Subway Airport High building
viaductor bridges tunnel engineering generating station Workshop

Overpass Warehouse shelf Chimney Water tower Large stage

Characteristics:
1.Multipurpose
2.Less structures, easy to operate
3.High economy
4.Easy wedge to connect
5.High loading capacity
6.Being safe and reliable
May-04-16
 
Drop forged scaffolding double coupler British type


Drop forged double coupler British type,which is widely used in global market to connect 48.3mm tubes at 90 degrees.
Unit weight: 0.97kg
Customized marks can be made
Surface finish: electro galvanized,or hot dip galvanized
Meeting EN74 and BS1139 Standard
Packing: 25pcs in one bag,50 bags are packed on one wood or steel pallet
Rich experience in producing all types of scaffolding couplers,pressed type and drop forged type.We have our own forging line
Fast delivery
May-04-16
 
Six advantages of the Scaffolding:
1.Safe
2.Save material
3.Save energy
4.Being artistic
5.More effective
6.Environment protection

Application:
Highway Overpass Subway Airport High building
viaductor bridges tunnel engineering generating station Workshop
Apr-12-16
 
Specification
Item Weight(kg)Specification
3.0m kstage standard 17.4748.3*3.8mm
2.5m kstage standard 14.6948.3*3.8mm
2.0m kstage standard 11.9148.3*3.8mm
1.5m kstage standard 9.1248.3*3.8mm
1.0m kstage standard 6.3448.3*3.8mm








3.56kg 6.35kg 9.12kg 11.91kg 14.7kg 17.47kg
Jul-13-18
Supplier From Pune, Maharashtra, India
Nov-14-20
Supplier From Karachi, Sindh, Pakistan
Jul-30-20
Supplier From Doha, 233, Qatar
May-21-20
Supplier From Surabaya, Jawa Timur, Indonesia
Jul-24-19
Supplier From Sitiawan, Perak, Malaysia
Feb-28-19
Supplier From Vadodara, Gujarat, India
Nov-03-21
3783 Building Construction Machineries And Equipments Suppliers
Short on time? Let Building Construction Machineries And Equipments sellers contact you.