Blowers.Roots blower
Warning lamp, transformer, voltage regulator, fire series.Warning lamp, transformer, voltage regulator, fire series
Aac aaac abc acsr acar cable, overhead cable,.
IR receiver module, IR receiver extender cable, ir emitters, lighting, fiber optic module, optical switch, light sensor.IR receiver module, IR receiver extender cable, ir emitters, lighting, fiber optic module, optical switch, light sensor
Materials: carbon steel and stainless steel (302,304,304L,316,316L etc). Characteristics:The welded stainless steel water well screen is made up of rods and warp. The rod can be round wire, triangular wire or trapezoid wire. The warp is triangular wire (V-shaped wire). Water well screens have a structure and high open area, as well as accurate slot dimension. At the same time, water well screen have heat-resisting, anti-corrosive, good machine capability, last long, safety and reliability and so on characteristics. It can be used in many kinds of medium filtering. Uses: The strainer is a kind of filtered water tubing with the perforation .it can use with the deep well pump, dive the water pump, also may use in the water-treating equipment, the environmental protection, the sea water transforms into the industrial water and life use water desalination treatment, running water treatment, water softening treatment, the petroleum industry: The petroleum product terminal filters and the chemical acid, the alkali liquid filters, the ethyl alcohol and so on the organic solution recycling filters. Continuous slots significantly increase discharge area,thus providing greater access to water-bearing zone . We can produce this pipe with diameter 80mm-550mm ,slot size 0.1mm-10mm,length 50mm-5850mm .
Solar system , solar road stud , solar garden light and other road safety products.Solar system , solar road stud , solar garden light and other road safety products
Coal, charcoal, dacron pillows, handicrafts such as tampih, palm fiber brooms, coconut fiber foot mats, pandan mats..
Our Quality IBC liner steel cage WIRE MESH FOR IBC TANK FRAME are great steel cage mesh for IBC Frame for use in Hotels, Garment Shops, Building Material Shops, Manufacturing Plant, Machinery Repair Shops, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction works , Energy & Mining, Food & Beverage Shops, Other, Advertising Company. The Core Components Includes PLC, Engine, Bearing, Gearbox, Motor, Pressure vessel, Gear, Pump
SFEX CT Manteau, also called the Cable Tray Manteau, is very efficient in extinguishing the initial fire suppression with immediate responses in case of fire because when a micro capsule for fire extinguishing reacts to a certain temperature and flame, it automatically disperses extinguishing agents. It\'s based on a cooling fire extinguishing method, shows an excellent characteristic of being able to extinguish a fire completely with an immediate response at the time of initial fire if you cover it over the electric power line. SFEX Solution : SFEX CT Manteau / SFEX AP Tape 1. Horizontal Section Fire : Access Floor, Cable Pit, and Cable Tray Installation and How It Works 1. Cover the SFEX CT Manteau. 2. Prevent the spread of fire with extinguishing/flame retardance properties 2. Vertical Section Fire Installation and How It Works 1. Wind the SFEX AP Tape on the cable. 2. Prevent the spread of fire with extinguishing/flame spread prevention properties Test Result : AP Tape Test Item Test Standard Unit Test Result Flame test of vertically placed cables The carbonization length should not exceed 2.5mm from the bottom edge of the burner - Do not exceed (carbonization length: 0.6m) During installation, photograph after installation *Test Information Test Facility Standard : KS C IEC 60332-3-10 : 2003(Compliant) Volume of nonmetallic material(L) per meter of test specimen : 1.5 (volume of nonmetallic material for finished cable, not including AP Tape) Number of test pieces : 5 Number of tiers : 1 Number of burners : 1 Position of test piece : Spatial type Flame application time (minutes) : 20 AP Tape installation method : AP Tape in 0.6/1 kV TFR-CV 4C 35 from the height of burner to the top 10cm gap between AP Tape and 20cm length of AP Tape