Product Description Highway construction 150 ton overhead launching girder equipment is generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder. Packing & Delivery Packing 1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying; 2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport. Delivery 1. If the size of Highway construction 150 ton overhead launching girder equipment are suitable for container ship, usually by container; 2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance. Delivery time Within 30 to 40 working days after the receipt of deposit. Transportation Generally 35 days to 50 days to destination port.