Feature
1.Light weight, large load, strong wind resistance and so on.
2.Reasonable structure and favorable performance.
3.Smooth starting and stopping.
4.Safe and reliable traveling, long life.
5.Low noise, commodious cabin with good view.
6.High quality automatic welding and NDT inspection
7.Designed according to your requires
Description
QD model double girder bridge overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work.
The double girder bridge overhead crane with a hook, have only a set of lifting mechanism. More than 16/3.2 tons of double girder overhead crane with two hooks, it has two independent sets of hoisting mechanism. The main hook used to lift heavy objects, the auxiliary hook lift light objects, in which the rated load range can also be used for collaborative main hook tilting or tipping the material. But must pay attention, do not allow the two hooks lift two goods at the same time. If the two hooks work together, the weight of the object will not exceed the rated lifting weight of the main hook.
Double girder bridge overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling.
Double Girder Overhead Crane with Electromagnet is a specialized crane for lifting and moving steel products, steel plates and steel pipes. This crane is constituted by girder, traveling mechanisms, lifting trolley, electric parts and electromagnet spreader. The electromagnetic suction force of this overhead crane can last 10 minutes after power off. And the shape of electromagnet spreader could be customized bases on the shape of materials to be lifted.
Feature 1.Light weight, large load, strong wind resistance and so on. 2.Reasonable structure and favorable performance. 3.Smooth starting and stopping. 4.Safe and reliable traveling, long life. 5.Low noise, commodious cabin with good view. 6.High quality automatic welding and NDT inspection 7.Designed according to your requires Description QB model double girder bridge overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. The double girder bridge overhead crane with a hook, have only a set of lifting mechanism. More than 16/3.2 tons of double girder overhead crane with two hooks, it has two independent sets of hoisting mechanism. The main hook used to lift heavy objects, the auxiliary hook lift light objects, in which the rated load range can also be used for collaborative main hook tilting or tipping the material. But must pay attention, do not allow the two hooks lift two goods at the same time. If the two hooks work together, the weight of the object will not exceed the rated lifting weight of the main hook. Double girder bridge overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling.
QE Model double trolley overhead crane is suitable to lift long materials(wood, paper tube, pipe and bar) in workshops or outdoors to store in factory and mines. The two trolley could work separately and at the same time. QE double girder overhead crane are mainly consists of Girder frame, Crane travelling device, two lifting trolley and electrical parts. Bridge adopts box welded structure, high degree of vertical and horizontal rigidity; crane travelling mechanism adopts separate drive. It has a strong beam and a stable travelling mechanism; the emergency switch can stop any movement once any dangerous happened. It is rely on the bridge frame along the workshop rail direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. It is an excellent choice where high speeds and heavy service are required. As the widely used hoisting machinery currently especially is suitable for working at warehouses and freight yard and other department it is prohibited to use the equipment in the combustible, explosive or corrosives environment.
Hoist double-beam bridge crane has the advantages of compact dimensions, low building headroom, light weight, and low wheel pressure. This product is mainly applicable to the transfer, assembly, maintenance and loading or unloading operations of mechanical processing workshops, auxiliary workshops of metallurgical plants, warehouses, stockyards, and power stations. It can also replace ordinary double-beam bridge cranes for production workshops in the light textile industry and the food industry. The work type is light and intermediate, and the working environment temperature is -20-40 ° C. It is prohibited to use in flammable, explosive, and corrosive medium environments. Our company mainly produces hoist double-girder bridge cranes with rated lifting capacity below 63 tons.
Double Girder Overhead Crane Double Girder European Overhead crane is based on advanced technology and international standard: FEM (Europe), DIN (Germany), ISO(International), is the renewed product, is an intelligent crane. Its structure is much more reasonable and its assemble is more superior. The limiting size is the lowest between the top of crab and the track of trolley, reduces 20%-30% compared to traditional Double Girder Overhead crane, and can reduce the capital of workshop 20% efficiently. It has hard-tooth reducer, imported wire-rope, trinity drive. It is equipped with such protecting devices as alarm device to overloading, obliquely hanging, second protecting equipment preventing hook clashing, current phase protection, etc. the electric appliance adjusts speed without contact or spark module, and fulfill converter function, including mini-speed and double speed, which make traveling and lifting very steady. Double Girder European Overhead crane lifting capacity is from 5t to 500t, span is 10.5~31.5m, work environment is -10 to 40 degree, working duties are A5-A6. Must not use for lifting blazing & melting metal, toxicant, explosion-proof or other dangerous material. 1) capacity: 5T-50/10T. 2) span: 10.5m-31.5m. 3) Lifting height: 3-60m 4) Working grade: A5, A6 5) Remote or Cabin Control 6) Lifting speed: 0.1-8m/min 7) Cross travelling speed: 2-30m/min 8) Long travelling speed: 2-45m/mim Double Girder Gantry Crane Feature * Small dimension, light dead weight, small wheel pressure * Lifting limiting distance is minimum from hook to floor, lowest headroom, lifting height more higher, increases work efficiency * New workshops can be designed more smaller, save a amount of money from initial construction investment * Strong rigidity, light dead weight, low power, outstanding structure * Applicable to the transfer, assembly, check, repair, load and unload at mechanic processing workshop, subsidiary workshop of metallurgical mills, warehouses, goods yard and power station. * Spreader optional, hook, grab bucket, magnet chuck and so on. * Schneider electrical, ABM/Nord / SEW triple gear motor * Galvanized high strength wire rope * Self-adjusted disk brake, hard tooth reducer
This double girder overhead crane with electric hoist is for lifting 5t~50t stuff. It's very convenient to install in new or existing workshops. This crane is easy to operate with various functions. With the advantages of compact structure, light weight and high lifting height, double girder overhead crane with electric hoist is widely used in workshops, metallurgy, warehouses and assembly shops etc. Weihua double girder overhead crane with electric hoist has beautiful box-typed welded main girders. Computer optimized design for main girders with good performance and light weight. And the span reaches 40 meters.
The crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device, another side is prepare for the assemble of the trolley conductor device. There are full field of view Cabin suspend under the main girder, there are joint control desk or single control box packed within the Cabin, assemble the sidelong ladder between the Cabin and moving table, The main girder joint with the two side end carriage which with the joint point in the middle.
ABUS double-girder overhead travelling cranes Load capacity: up to 120 t Span: up to 40 m(depending on load capacity) Easy to install accessories High crane and trolley travel speeds possible Wide range for connection variants for optimum adaption to local conditions Very high hook positions possible
1.Introduction This crane mainly consists of strong bridge beams, trolley-travelling mechanism, crab and electric appliances, and could be classified into several working duties, e.G. A5, a6, a7, according to the working frequency and pure working time. 2.Control method Remote control, pendent line with push button , cabin control 3.Design and construction rules All the standards required for the crane is according to china standards. 4.Painting Primer and finishing paint Color:according to your requirements Average thickness:about 100microns 5.Standard capacity 5tons, 10tons, 16/3.2tons, 20/5tons, 32/5tons, 50/10tons, 75/20tons, 100/20tons, 100/30tons, 125/30tons, 150/30tons, 160/32tons, 200/50tons, 400/80tons, 560/250tons.