Model No:NG90
Discription:Gas power concrete Nailer
Nail range:Nail length:1.3~4.0cm
Dimension:455x388x110mm
Weight:3.7kg
Magazine Capacity:40 nails
Service life:1000-1200pot
Fuel Rod Life: 1200 nails
Battery life:4000 nails per charge
Speed:2-3 nails per second, no more than 1200 nails/hour or 5000 nails/day
Blow case/pc
Material: high carbon spring steel, spring steel, stainless steel, alloy steel Compression Spring, Extension Spring : Wire Diameter: 0.2-40.0mm Torsion spring wire diameter :0.2-35mm Surface Finish: black , Zinc, Nickel, silver, golden, tin, powder coating, shot pin Applications: Automotive, medical device, agricultural machinery ,electronics, toy, electric power distribution. Extension spring hook include Germany hook, British hook, Side hook We can customize special design of springs based on your requirement.
Ntm engineering proposes designing gas turbine power plants of small, medium and large capacity. We carry our research, development and engineering projects under the terms of the order of the customer, provide the necessary technical documentation, offer new development, technologies, innovations in energy industry. Ntm engineering combines human talents and modern software technologies to create r&d projects quality and timely. Our high qualified specialists have a large experience in energy industry.
7.5 MW Power plant was installed in the year 20011-12. The plant is not in operation since 2013-14 due to the high price of Gas making the production presently economically nonviable. Gas Turbine. Make â?? KAWASAKI. Model: m7a-03d (gpb80d) Rev. speed: 13790 rpm Fuel: gas fuel (natural gas) Alternator, 8489KVA, 11KV, 4 Pole, 0.9PG, insulation & temperature class F/F with Brushlesm7a-03ds, Self PMG. The turbine gen set is also made by KAWASAKI, Japan. Running hours of the Gen. Set is 7800 hours (approx.) only. All the motors, control valves, flow transmitters, pressure transmitters and control panels are in good condition and are available along with composite unit. For more details, kindly contact Mr. Rajdeep Datta (+91-8336925974, rajdeep.datta@mjunction.in)
30 MW LM2500 Gas Turbine Power Plant Complete plant with (1) Two 30 MW LM2500 Gas Turbine, HRSG boiler with supplementary burner 10.5 KV, 50HZ, Turbine Year: 2007, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 12000 hrs., Borescope performed in 2016, Large amount of Spares come with Package, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
60 MW Wartsila Natural Gas Power Plant Consists of (6) 9730 KW Wartsila 20V34SG Natural Gas Engines and AVK Alternators, Fuel: Natural Gas, Year 2010/2011, 11 KV, 50 HZ, low running hours. Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
140 MW Wartsila Natural Gas Power Plant Complete Natural Gas Power Generation Plant in new condition with only 1300 hours of operation, equipment manufactured in 2011/2012. Plant has (13) 9730 KW Wartsila 20V34GS Natural Gas Reciprocating engines with AVK Alternators, Siemens Steam Turbines heat Recovery Boiler, 11 KV, 50 HZ, Fuel Natural Gas, includes all auxiliary equipment. Plant is being sold at a reduced price for quick sale.
95 MW Wartsila Natural Gas Power Plant Consists of (12) Wartsila 20V34SG Natural Gas Engines and ABB Alternators, Fuel: Natural Gas, Year 2005/2009, 11 KV, 50 HZ, Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
46 MW LM6000 PC Sprint Gas Turbine Power Plant Complete plant with 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, 60 MT/HR (HRSG), Fuel: Natural Gas, 17,000 hrs. since overhaul, Year of commissioning 2006, 11.5 KV, 50 HZ, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
200 MW Siemens SGT-800 Gas Turbine Power Plant Three (3) Siemens SGT 800 Gas Turbines, Siemens Steam Turbine, 3000 rpm, 50HZ, Commissioned Year: 2013, Total operating Hours, 21,000, Hours ran after last inspection 2500 hrs. (3) HRSG, RMS station, HV switchyard,, electrical systems, control systems, air systems, cooling systems, compressor systems, pumps, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.