Complete system for outloading of bulk goods from and to silos and trucks with a movable scale between the siloes. Grid slides makes the dosing very precise.
Stainless steel conveyor belt Stainless steel conveyor belt is a kind of friction drive in continuous way transport material machinery accessories. It can be material in certain transportation on-line, from the original material feeding point to the final discharge point is formed between a material conveying process. It can break bulk material transporting, can also be transmitted into items. Except for pure material conveying, can also with various industrial enterprise production process match the process requirement, the formation of rhythmic flow process route. So the metal mesh belt is widely used in modern all kinds of industrial enterprises. Industry is the automatic device and the modern automation assembly line indispensable important parts. Stainless steel conveyor belt: with smooth surface, high toughness, strong corrosion resistance, tensile strength, good permeability and difficult to deformation, durability, rust and other special functions. Widely used in glass industry, food processing industry. Stainless steel conveyor belt is widely used in areas such as cement, metallurgy, casting, chemical transpor T materials. Can be used for high temperature resistant, resistant to burn conveyor belt, belt, electronic balance tear conveyor belt, acid and alkali resistant, oil resistant conveyor belt, etc.
Description Double girder overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. It could be classified into several working duties, e.g. A5, A6, A7 according to the working frequency and pure working time. Double girder overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling. Features Reasonable structure and favorable performance. Smooth starting and stopping. Safe and reliable traveling, long life. Low noise, commodious cabin with good view. High quality automatic welding and NDT inspection. Crane drive: IP54 or IP44, level F insulation. Designed according to your required.
QD Double Girder Hooks Overhead Crane Feature 1.Light weight, large load, strong wind resistance and so on. 2.Reasonable structure and favorable performance. 3.Smooth starting and stopping. 4.Safe and reliable traveling, long life. 5.Low noise, commodious cabin with good view. 6.High quality automatic welding and NDT inspection 7.Designed according to your requires Description QD model double girder bridge overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. The double girder bridge overhead crane with a hook, have only a set of lifting mechanism. More than 16/3.2 tons of double girder overhead crane with two hooks, it has two independent sets of hoisting mechanism. The main hook used to lift heavy objects, the auxiliary hook lift light objects, in which the rated load range can also be used for collaborative main hook tilting or tipping the material. But must pay attention, do not allow the two hooks lift two goods at the same time. If the two hooks work together, the weight of the object will not exceed the rated lifting weight of the main hook. Double girder bridge overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling.
Feature 1.Light weight, large load, strong wind resistance and so on. 2.Reasonable structure and favorable performance. 3.Smooth starting and stopping. 4.Safe and reliable traveling, long life. 5.Low noise, commodious cabin with good view. 6.High quality automatic welding and NDT inspection 7.Designed according to your requires Description QB model double girder bridge overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. The double girder bridge overhead crane with a hook, have only a set of lifting mechanism. More than 16/3.2 tons of double girder overhead crane with two hooks, it has two independent sets of hoisting mechanism. The main hook used to lift heavy objects, the auxiliary hook lift light objects, in which the rated load range can also be used for collaborative main hook tilting or tipping the material. But must pay attention, do not allow the two hooks lift two goods at the same time. If the two hooks work together, the weight of the object will not exceed the rated lifting weight of the main hook. Double girder bridge overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling.
Feature 1.Light weight, large load, strong wind resistance and so on. 2.Reasonable structure and favorable performance. 3.Smooth starting and stopping. 4.Safe and reliable traveling, long life. 5.Low noise, commodious cabin with good view. 6.High quality automatic welding and NDT inspection 7.Designed according to your requires Description QD model double girder bridge overhead crane is composed of box type bridge frame, lifting trolley, crane traveling mechanism, and electrical system. It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam direction moving transverse and the hook lifting movement to work. The double girder bridge overhead crane with a hook, have only a set of lifting mechanism. More than 16/3.2 tons of double girder overhead crane with two hooks, it has two independent sets of hoisting mechanism. The main hook used to lift heavy objects, the auxiliary hook lift light objects, in which the rated load range can also be used for collaborative main hook tilting or tipping the material. But must pay attention, do not allow the two hooks lift two goods at the same time. If the two hooks work together, the weight of the object will not exceed the rated lifting weight of the main hook. Double girder bridge overhead crane allocation hook used in machining, assembly workshop, metal workshop, metallurgy and casting workshop and warehouse handling work; allocation of grab is suitable for metallurgy, cement, chemical or open fixed span in bulk material handling.