Modern climbing formwork systems consist of large wall forms mounted on climbing scaffolds. As part of the first concrete pour, the climbing supports are attached to pre-set anchor bolts. This ensures the transfer of wind and constant loads from the wall formwork and supports. The formwork also used two climbing brackets to create a working platform to align and support the panels.
After pouring the concrete, the lifting boots and screws were installed. Both the climbing platform and the formwork were then lifted to a new suspension point for the next pouring cycle.
Rimmca climbing formwork cb180 & cb240 provides safe working conditions with wall formwork at all heights. The well thought-out design combines easy handling with a fast moving procedure and problem-free adjustment to suit different building shapes.It's extremely easy to set up , and can be tailored to meet a wide range of different requirements. Strong High loading capacity of the brackets allows the formation of large scaffold units Flexibility and time-saving It is a cranelift climbing formwork for structures of any shape and inclination.By turning pressure, spindles, the climbing formwork cb240 & cb180 can be perfectly accommodated to structures whose inclination varies from one-cycle to next. Safe Wide work-platforms with plenty of space for fast, safe working Completely free of tripping hazards in front of and behind the formwork because of the wind bracing
Supplier: Hydraulic climbing fromwork, cantilever climbing formwork, steel formwork, tunnel formwork, table formwork, scaffolding, shaft beam platform, formwork accessory
Services: Manufacturer & exporter
Supplier: Scaffolding, formwork, climbing systems and safety systems
Supplier: Base 20 wall formwork, slab table formwork, slab flex 20 formwork, steel formwork, plastic formwork tp60, aluflex formwork, trench box shoring, heto frame formwork, aludeck formwork, tst60 shoring tower, multi function climbing formwork, single side formwork, self climbing platform(facade protection), tecon ringlock, aluminum formwork, climbing/jump formwork(core wall/bridge), tecon self climbing formwork
Services: Production and shipping
Greetings! GETO always focusing on formwork and scaffolding system R&D and development, design, production, leasing, sale, renovation and technical services. Our scaffolding is known as GT-18 Integrated Attaching Lifting Scaffolding and it is suitable for high-rise and super-high-rise buildings with frame or shear wall structures. Through the application in different sites, it has been proved that its performance is excellent, safe, reliable, stable operation, economic and practical, which brings great convenience to the construction and production for most users. Components: Lifting System, frame system, thunder protection system,anti fall and anti-tilt system and control system Lifting System: Consists of slideway, lifting hanging bracket, lower hanger frame, electric chain hoist, and over hanger frame. Frame System: Main component of attaching lifting scaffolding, and also the safe operation platform for constructors. The frame structure is mainly composed of Walkway plate, poling, Protective net, truss, turning plate etc. Thunder Protection System: The system consists of air termination, grounding grid and grounding wire Anti-falling, Anti-tilting System: The anti-falling and anti-tilting system is a supporting structure that is directly attached to the building structure and connected to the vertical main frame to withstand and transmit loads. With support, anti -fall, anti - capsize function. Control System: To form the control system, some essential components are computer,mobile phone, tablet PC, remote controller, sensor main control box, sub-control box, cable line and loading sensor.
Greetings! GETO offers comprehensive formwork solutions for different situations, for example, basement floors, podium floors, typical floors, etc. With well-constructed panels and reasonably-arranged reinforcement systems, our products can control the deviation of flatness and perpendicularity to achieve the plastering-free concreting finish. GETO aluminium formwork can 100% turn your design into reality and achieve no-plastering concreting to lower your cost on building surface decoration. GETO also has developed four types of aluminium formwork systems, which are Flat-Tie System, Tie-Rod System, Timber & Aluminium Formwork System, and Aluminum Formwork with Precast Concrete System. Application: Concrete casting / Building house Reusable times: More than 300 times Model Number:Aluminium alloy 6061-T6 After sale service: Online technical support, on-site installation, on-site training and inspection, free spare parts, return and replacement Place of Origin:China Characteristics: Large load capacity, light weight, high efficiency, low cost and long working life
Supplier: Aluminium Formwork, Scaffolding, Self -Climbing Platform, Concrete Formwork, Wall & Column, Beam, Slab
Supplier: Aluminum formwork system, self-climbing scaffolding
Services: Design, production, packing, inspection, delivery
We produce; All kinds of scaffolding&formwork systems and components, column and wall formworks, slab formworks, sheet iron formworks, adjustable slab props, facade and under mold scaffoldings, culvert formworks, viaduct formworks, climbing formwork systems, single sided wall formwork systems, dam project formworks. Our products are widely used in apartment, bridge, vessel, aircraft hangar, tower, tunnel, business center, sport complex, stadium, factory and all types of architectural complex constructions.