This product is suitable with strong formula for cleaning concrete .
Usage area of maintenance construction industry mainly.
Products are packaged in politilen drums of 30 kg.
Supplier: Railway concrete sleeper remove oil suprimo 1000
Supplier: Concrete recycling, aggregates, concrete crushing, concrete disposal, demolition concrete, concrete removal, asphalt dump, ap65 recycled aggregate, ap40 recycled concrete, â??ap20 crushed concrete, 40/20 concrete drainage metal, screened top soil, gap 65 rock, gap 40 quarry products, gap 20 metal, gap 7 aggregate, sap 7, 50/20 scoria, 25/75 scoria
1. Portable concrete mixer applications: Electric Mobile Mini Concrete Mixer is mainly used in the field of small-scale architecture and decoration for mixing mortar, and mixing chemicals and feed etc. 2. Portable concrete mixer specifications: Model: PCM-600 Drum Capacity : 170L(6Cu Ft) Discharging capacity: 85L Motor: 0.55kw gearbox direct drive Frame: Removable steel wheelbarrow style Drum RPM : 21 Paddles: 3 steel blades Drum: UV-Proof PE Wheel: Flat free rubber wheel 16"x4.00-8 Power Source: 115V/220V,60Hz/50Hz,Single phase NW/GW: 56KGS/60KGS Packing size: 82x74x69cm 20GP/40HQ: 72PCS/144PCS. 1pc/carton.
1. Portable concrete mixer applications: Electric mobile mini concrete mixer is mainly used in the field of small-scale architecture and decoration for mixing mortar, and mixing chemicals and feed etc. 2. Portable concrete mixer specifications: Model: PCM-350 Drum Capacity : 120L(3.5Cu Ft) Discharging capacity: 60L Motor: 0.55kw gearbox direct drive Frame: Removable steel wheelbarrow style Drum RPM : 21 Paddles: 2 steel blades Drum: UV-Proof PE Wheel: Flat free rubber wheel 14"x2.50-8 Power Source: 115V/220V,60Hz/50Hz,Single phase NW/GW: 46KGS/50KGS Packing size: 75x63x63cm 20GP/40HQ: 96PCS/192PCS. 1pc/carton.
Shenglong Injection packer for high pressure grout Features High pressure injection packers for concrete crack repairs , waterproofing ,rehabilitation of concrete structures , basement leak sealing cracksealing etc. Shenglong injection packer for injection machine spare parts is uesd with the Shenglong injection machine in concrete crack repair and water leaking stop. It suits for both polyurethane and epoxy injection. Method of Construction for Injection 1.Crack and leakage condition inspection Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure 2.Drilling Operation Drill directly into crack section if the thickness of concrete is thinner than 10cm. For the thickness of 10~50cm, drill it with 45 degree angle by keeping a distance of 1/5 of concrete thickness. Make sure it penetrates the crack section. If the thickness is over than 50cm, keep the distance of 20~30cm and drill it with 45 degree angle until it penetrates crack section. And keep drilling by maintaining the fixed interval. (5 holes per 1 meter. Drill it in zigzags) 3.Packer Installation Clean the inside of drilled holes with compressor. Make sure that rubber sleeve of packer and cutting line of tightening nut should be put into the inside of concrete surface when installing. Tighten the packer completely by using the T-box. (Packer might be damaged if you tighten it too strongly) 4.Injection Operation Inject the waterstopping material by using the high pressure device or grease gun. Maintain the initial injection pressure as around 40kg/cm and increase the pressure by each 10kg/cm gradually until the waterstopping material flows out from crack section. Water will come out from the crack section first and then waterstopping foaming agent and then water stopping liquid at last. If the waterstopping material that is not foamed comes from the crack section, then move to next packer for injection. 5.Packer Removing Operation Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again. 6.Finishing Operation Remove the water stopping material that is remained on the crack section. Spreading with the elastic sealing material. SL-8 (80*13.5*14)mm SL-10 (100*13.5*14)mm SL-15 (150*13.5*14)mm SL-20 (200*13.5*14)mm SL-25 (250*13.5*14)mm SL-30 (300*13.5*14)mm SL-100 (1000*13.5*14)mm In carton
Failure phenomenon: batching station concrete trailer pump stone feed pneumatic door stones stuck not open. Analysis: batching station pneumatic door there is a big gap doors and small gap doors, big gap door its clearance greater than normal gravel particle size, so as to avoid the card material. Its small gap door gap is generally in the 5 ~ 10mm, 10mm below the stones card into the gap, it is difficult to pneumatic door jammed. Batching station after a period of use, the aggregate diesel engine concrete mixer spout wear, when the the gap wear to diesel concrete pump supplier 20 ~ 30mm, the card into the larger stones entering the gap in the process of the door, the gravel can easily stuck (wedge force) , pneumatic door can not be opened. Concrete mixing station troubleshooting method. twin shaft concrete mixer process: Check the pneumatic valve clearance and adjust to the appropriate value, can not be adjusted to the appropriate value as a result of excessive wear, you need to add welding steel plate or round bar in the feed opening, the gap reached a reasonable value. Take gray tank top, conveying powder to jar. Failure phenomenon: the bulk cement truck screw conveyer for sale the powder tank pump ashes, cement tank top with powder smoke. Analysis: conveying powder to powder cans transported by compressed air, compressed air, the powder to the powder cans into the air, such as dust removal machine cement mixing machine supplier filter clogging dust mobile concrete batching plant collector filter tank top, compressed air can not discharged generated "pressureout, and when the pressure reaches the safety valve opening pressure of the tank top, the safety valve opens, the diesel concrete pump for sale compressed air and powder through the safety valve is vented to the atmosphere, resulting in the risk ash phenomenon. Another level gauge failure, powder filled continue feeding also appears to take the gray tank top phenomenon. Process: 1, check movable concrete batching plants tank top dust filter and clean-up. 2, Once the take Ash phenomenon appears, you must clean up the safety valve around the powder, avoid powder caking the rain plug the safety valve. 3, as a result of the powder overfilled and take the gray, you must check on the level meter and a the material full alarm device reliability. Belt rainy slip. Fault slip phenomenon: a rainy day, inclined belt with load operation. Analysis: rainy, a moisture in the aggregate, and belt exposed parts easy to wet, damp, especially the inner ring and wet belt to screw conveyor reduce the coefficient of friction between the belt and the drive rollers, so that the drum is passed to the reduction in the belt torsional torch, the torque less than the belt material handling required torque, belt slipping.