Supplier: Chemical, chemical raw material, auxiliaries, solvents, paint, coating, rubber, plastic, plasticizer, surfactant, additives, steel pipe, steel tube, stainless steel tube, stainless steel pipe, pipe fitting, flange, fasteners, steel wire, steel accessories
Services: Transportation agent,customs clearance service,
Buyer: Import chemical raw materials, auxiliaries, bulk commodities
PC natural 100% pure pc without any coating MATERIAL: PC natural 100% pure pc without any coating CATEGORY: PC TYPE: Natural SPECIFICATION: Separate 25 kg bag and Mark per month 78 mt 100% pure pc without any coating ,post Industrial materials Origin: Bangladesh LOADING WEIGHT: 24 Ton FOB (USD/Ton): 1450$ - 1700$ Packaging: Jumbo Bag Est. Shipping Time: 15, 30, 45 days Our Commitment We are committed to delivering in accordance with the quality given, source and licensed in the field of scrap transportation. 2Lians always for the purpose of satisfying customers on the criteria of sustainability and fairness through high work efficiency
DATA SHEET FOR EPOXY EPOXY COATING :- INTRODUCTION - EPOXY COATING (HYB) is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. Nonskid surface finish can be achieved on floor, if required. FEATURES: 1) Hard Wearing 2) Non Dusting 3) Excellent Surface Finish 4) Non Smelling 5) Good Aesthetics 6) Highly Chemical Resistant APPLICATION: 1.Stir well before mixing Part A and Part B and mix in the prescribed ratio. 2.Apply one coat of EPOXY primer on the clean and dry surface. 3.EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere. 4.Apply min. 2 coats with the intercoat interval of 6-8 hrs. PRODUCT SPECIFICATIONS: Application - Brush, Roller Mixing Ratio - As Directed on Packing Port Life - 30 Mins. Drying Time - Touch Dry- 30 Min, Hard Dry 6 Hrs. - Intercoat Interval 6-8 Hrs. Min. - Dry Film Thickness 125-150 Microns/per coat - depending on porosity Covering Capacity - 6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades - All Standard Shades RECOMMENDED USES: 1) Food & Pharmaceutical 2) Work Shop 3) Clean Room Application 4) Chemical Resistant Coating for Concrete& Steel 5) Petrochemical, Fertilizer plants METHOD OF APPLICATION: SURFACE PREPARATION The long-term durability of the applied Epoxy coating (HYB) epoxy coating is dependent on the adhesion between sub-base and coating material. It is most important therefore, that the substrate surfaces are correctly prepared prior to application. 1.Before application of the Epoxy coating (HYB) surface should be free from loose partials, rust, oils, grease or earlier coatings and should be totally dry. 2.New concrete or cementations surface should be placed at least 28 days and have a moisture content of less than 5% before application of Epoxy coating (HYB) 3.After surface is dry, all repair work like sealing of joints, cracks filling of cavities and crevices should be carried out. HEALTH & SAFETY - Keep the containers tightly closed when not in use. Avoid contact with skin & eyes. It comes in contact with the body, wash affected parts with plenty of water and contact a doctor. Other known sector for Epoxy floor lining, Epoxy garage floor lining, Concrete epoxy lining, Concrete floor epoxy lining, Epoxy pipe lining, Marine epoxy lining, Sub marine epoxy lining, Basement lining epoxy floor shield, Louisiana, Oregon, Chip lining color epoxy floor, Aviation lining epoxy interior.
Supplier: Refractory bricks, high alumina bricks, acid proof bricks, tiles and castables, all mortars and fire clay, low cement castables, insulating castables, conventional dense refractory bricks, insulation bricks, cold face, hot face insulation bricks, hot face insulation bricks, acid resistant bricks/components, membranes, acid resistant cement, construction chemicals, class 1 ar tiles and bricks 38mm and 75mm, 4457 vitrified ar tiles with 0% water absorption, 20mm & 25m, primer, mastics, pot. silicate cement, coerce cement, furnace based cement, crushed refractory boiler bed material, acid resistant tiles, acid resistant brick fireclay type, acid resistant brick red shale type, bitumen primer, epoxy resin & hardner, furan powder and syrup solution,
* PHOSCAST Phoscast : Phosphate Bonded Castables * PURPOSE customers using FBC boilers (Particularly underbed feed FBC boilers) for the protection of inbed coils against erosion potential by applying highly abrasive resistant refractory on inbed coils above fuel feed system. BACKGROUND * Two of such actions are providing special alloy studs on inbed coils and applying highly abrasive resistant refractory on the outer bottom loops of inbed Coils which are above the fuel feed nozzles. * GANESHAS has taken number of approaches to identify the key factors affecting erosion rates with an objective to enhance the life of inbed tubes as well as implementing the corrective action to reduce the erosion rates. Phosphate coatings are often used to protect steel parts against rusting and other types of corrosion * Erosion of inbed coils in fluid bed combustor is unavoidable phenomenon however the rate of metal wastage and thus the life of tubes depends on various factors like ash & fuel properties, design of Combustor / feeding system, flue gas velocities operating conditions etc. It has been also observed that maximum erosion prone inbed coils are those which come above fuel feed nozzles and an area of approximately 1 to 1.5 mts around fuel feed systems are badly affected. APPLICATION Phoscast-90 XR can be applied by ramming with wooden mallet having adequately large head @" dia x 5" length x 10â?? Jong handle). The desired lining or repair thickness is built up in several courses while ramming the mass to uniform thickness. Phoscast refractory should never be trawled to obtain smooth surface; ramming only should finish surface. Any excess mass is to be sliced off with trowel edge and then finished by ramming again for bed coil. Tube application of AFBC boiler, the material pasty mass should be finger pressed into the studs of the tube with maximum force. Finish should be given by pressing the hand palm against material applied, using surgical type thin rubber hand gloves.
Supplier: Electrical materials, electrical equipments, lighting fixtures, plumbing materials, ac materials, it materials, ceiling materials, partition materials, painting materials, floor tiles, hardware materials, hand tools & power tools, garage tools, wooden & carpenter materials, batteries. medical equipment and medical consumable product and medical surgical equipment.
Special Structual Spray-coat material for running track surface installation ,consume 1.20-1.25KG/m2 to achive 3mm Spray-coat Running track PU1:2 Spray-coat track material is an pigmented and solvent free thixotropic, two component polyurethane material with expanding form, strong resistance ,elastic properties, should be mix two component on project site, Spray-coat Running tack PU1:2 Spray-coat track material is easy to apply ,it shows excellent resistance to moisture during the curing phase and a good curing behavior even at low temperature
Supplier: Dish end, vessel, tank, air receiver, air header, anchor bolt, foundation bolts, scaffolding, ladder, grating, ss/ms steel heavy structure, heat exchanger, expansion bellow/joint, steel ladle/ tundish, limpet coil, powder coating, blasting & painting, agitated nutch filters, air cooled, plates wet scrubbers winery plant equipments wiremesh filters, blenders strainers zero, filter press, air ducts, air handling systems boiler consultants, maintenance, repairs fibre glass piping, compressed air systems, condenser direct contact type, cone blender, consulting engineers, conta blender, conveyor belts metallic, nut, scrubbers, iron, steel, aluminium, scrap, anti vortex designs for petroleum road tankers designs for pressure vessels designs for storage tanks designs structural fabrication
Standard Overprint Varnish provides a durable protective coating for printed materials, enhancing their appearance and longevity. Available in gloss, matte, and satin finishes, it is suitable for various applications. Technical Specifications: o Viscosity: 30-35 seconds (DIN 4) o Drying Method: Air-drying or heat-drying o Finish Options: Gloss, satin, and matte finishes available o Substrates: Compatible with coated and uncoated papers o Coverage: 8-12 m/L o Shelf Life: 12 months in unopened containers