1) we are exporter for plastic resin ( plastic raw material) mainly Polypropylene and Polyethylene 2) we are in this business since 2016, products origin is Saud Arabia 4) our main markets are Canada, Brazil, Morocco, Algeria, Egypt, Africa , Kenya and much more.
we can offer Fas Houston basis Polyethylene prime resin Ldpe.Hdpe and LLdpe film grades Formosa Usa in 25 kgs producer bags
DATA SHEET FOR EPOXY EPOXY COATING :- INTRODUCTION - EPOXY COATING (HYB) is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. Nonskid surface finish can be achieved on floor, if required. FEATURES: 1) Hard Wearing 2) Non Dusting 3) Excellent Surface Finish 4) Non Smelling 5) Good Aesthetics 6) Highly Chemical Resistant APPLICATION: 1.Stir well before mixing Part A and Part B and mix in the prescribed ratio. 2.Apply one coat of EPOXY primer on the clean and dry surface. 3.EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere. 4.Apply min. 2 coats with the intercoat interval of 6-8 hrs. PRODUCT SPECIFICATIONS: Application - Brush, Roller Mixing Ratio - As Directed on Packing Port Life - 30 Mins. Drying Time - Touch Dry- 30 Min, Hard Dry 6 Hrs. - Intercoat Interval 6-8 Hrs. Min. - Dry Film Thickness 125-150 Microns/per coat - depending on porosity Covering Capacity - 6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades - All Standard Shades RECOMMENDED USES: 1) Food & Pharmaceutical 2) Work Shop 3) Clean Room Application 4) Chemical Resistant Coating for Concrete& Steel 5) Petrochemical, Fertilizer plants METHOD OF APPLICATION: SURFACE PREPARATION The long-term durability of the applied Epoxy coating (HYB) epoxy coating is dependent on the adhesion between sub-base and coating material. It is most important therefore, that the substrate surfaces are correctly prepared prior to application. 1.Before application of the Epoxy coating (HYB) surface should be free from loose partials, rust, oils, grease or earlier coatings and should be totally dry. 2.New concrete or cementations surface should be placed at least 28 days and have a moisture content of less than 5% before application of Epoxy coating (HYB) 3.After surface is dry, all repair work like sealing of joints, cracks filling of cavities and crevices should be carried out. HEALTH & SAFETY - Keep the containers tightly closed when not in use. Avoid contact with skin & eyes. It comes in contact with the body, wash affected parts with plenty of water and contact a doctor. Other known sector for Epoxy floor lining, Epoxy garage floor lining, Concrete epoxy lining, Concrete floor epoxy lining, Epoxy pipe lining, Marine epoxy lining, Sub marine epoxy lining, Basement lining epoxy floor shield, Louisiana, Oregon, Chip lining color epoxy floor, Aviation lining epoxy interior.
We are a leading supplier of electroplating chemicals, industrial polishing and welding consumables, water treatment, powder coating, fertilizers. We stock and carry an extensive range of ready to use chemicals. We deal with so many different chemicals and we would like you to contact us for more information about our different chemicals and products.
Damar products is still needed throughout the world, it can have significant impact on price increases. We provide this Damar on an ongoing basis and can serve exports to your country. With quality packaging and production processes, making the products we sell have selling points that are not only economical but also safe. With our full support we help you become an importer of the products we sell.