We can tailor various kinds of toilet brush mould for each customer as per their requirements. The quotation can be made based on drawings or samples provided by the customers. Our products are both excellent in quality and reasonable in price. Your satisfaction is guarantee.
Following is the essential informations of toilet brush mould, for your reference
Product NamePlastic injection mould
Product materialPP,PE,POM,PMMA,ABS,PA etc.
Core&Cavity SteelAISI-P20,2738,718,2316 etc.
Steel hardness: Accdording to the steel
Mould Standard DME
Cavity Number Single or multi
Injection System Point gate,direct gate,side gate,submarine gate,fan gate etc.
Ejector SystemEjector plate,ejector pin etc.
Cycle TimeAccording to the product
Tooling lead time40-70 days
Mould life500,000-1,000,000 times
Quality assurance ISO9001
Our Advantage
1.High quality
2.Reasonable price
3.On time delivery
4.Good After-sale service
5.Strict quality control
6.All the mould are automotic.
Offer you in-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.
We can ensure customer:
1. Quickly response and complete understanding
2. The most competitive and reasonable price
3. Short delivery time
4. High quality.
Primary Competitive Advantages :
. Well and High Quality Control
. Prompt Delivery
. Customer's Designs and Logos are Welcome
. Competitive Prices
. In a Variety of Designs
. Small Order Acceptable
. OEM Accepted.
Plastic chair mould
1. Cavity:single
2. Mold Material: P20
3. Runner: cold runner
4. Delivery time: 60 days
5. Design software:UG, PROE, CAD
6. Mould base: home made mould base
7. Mould life: above 300,000 shots
8. Package: wooden cases or according to customers requirement.
The proceeding of processing
Step 1. Samples/drawing & requirements from you
Step 2. The sheet will be copied to our design department,tooling department to do the structure and feasibility analysis
Step 3. Before start mould design, the tooling schedule and processing sheet were done.
Step 4. Mould design:at the same time we will communicate & exchange the opinions with you.
Step 5. Material purchase:steel cutting and mould base tooling.
Step 6. Inspection of mould:our processing manager are following and controlling the tooling processing.
Step 7. Mould testing:we will inform you the date,then will send you the samples inspection report & injection parameters with the sample to you.
Step 8. Ready to ship out.
We have plastic injection molding machine for Sale
Please follow the specifications :
Model Year : JUNE 2017
Clamp Tonnage : 10800 KN
MODEL NO. : IA10800II
POWER : 181.8 KW
POWER SUPPLY: 380 V, 60Hz