its an ore that we take out with a very high concentration of zinc and lead. the zinc have an average of 41% and lead of 20% on a composite sample and we have approx 3000000tons of it
1 ton bulk bags and we can start on 130 metric tons per month and escalate after that.
we are experience in doing electroplating equipment, coating equipment , and enviromental equipment.With strong technical force and capability of manufacturing ,installing and debugging first-class equipment,we have more than ten senior engineers and engineers in charge of overall design for various electroplating engineering,design for technical equipment and development of new products