Curing Heating System:heating fuel can be divided into coal,electricity,natual gas,diessl oil,biological particles and so on.After powder coating,the workpieceis heated into the curing heating system at 180-200 degree by the converying chain,and it is heated for the corresponding time about 15-20 minutes to melt.