Application: The reinforcement of rock mass can improve the force of retaining piles, and can change the internal force distribution of the components. Characteristic: construction preparation - the anchor hole drilled - anchor cable installation - anchor hole grouting - waist beam (anchor beam, anchor pier or cross beam, steel stents)construction - waist beam and pile is filled with the concrete dense - anchor hole tension lock - acceptance of the anchor.