1.Automatically boot to no-load This Low voltage automatic system has designed two boot program according to power plant which has governor or not. 2.No Governor Early ,in order to save cost and some aspects ,there is no governor in power plant,so it will lead to some trouble such as over adjust or hysteresis adjust when automatic adjusting needles or guide vane opening.According to the problem as above mentioned,our products deal with the trouble and make it sooner ,more relax,more saver. 3.Governor Recent years,most power plant with governor ,it is easier to realize automatic,only need to boot ,the governor will do the rest things. When the governor or the products will be frequency to the speed of 95%,automatic system will send a wound ,the voltage of the machine is taken as system voltage stability,if the excitation failure,touch screen or background will send up the wound failure alarm information and voice information to prompt user. 4.No-load to grid. When the generator start excitation successfully,automatic system will increase needles and guide vane opening ,and increase the frequency 49 to 51HZ ,at the same time ,the automatic system will give a circuit breaker stored energy signal,judgment after storage in place,then send an synchronoscope signal,the synchronoscope is starting working,while the automatic system start to increase or reduce the number of needles and guide vane opening.