Work way:
1. The bridge: traverses on the railway;
2. The trolley: traverses on the bridge and lifts up and down;
3. The railway: mounted to the runway and building structure.
Working Duty:A5-A8;
Power supply:The standard is 3-phase A.C. 380V, 50Hz; the crane design can also be 400V,
415V or 60Hz.It is prohibited to use the equipment in the combustible, explosive to corrosives
environment.
Electric parts and electric hoist are packed by strong plywood crate, others packaged in plastic woven cloth.
Please ask detailed and specific
questions about Pricing, Minimum Order Quantity, Delivery Timelines etc. Detailed Messages
result in prompt responses.