(1) early in-house engineering and design evaluation to enhance design flexibility and to eliminate the need of additional operation. (2) project management and scientific mold building design for manufacturability (dfm) (3) material selection suggestion to maintain part tolerances and tooling reliability (4) improving part strength and structure to assure the quality, reliability and integrity of the end product. Please visit our web site at www (dot) pyramids (dot) com (dot) tw for more information. ---custom-made order acceptable. Please send us drawings for quotation.