At present, it is mainly applied to the shale gas well stratum reconstruction, which can realize the interlayer sealing effect during the staged fracturing operation, and can carry out high-pressure fracturing construction work on the upper production layer of the soluble bridge plug. At the same time, the bridge plug itself has a soluble nature. The bridge plug can be dissolved in a liquid containing chlorine ions such as clean water, active water, fracturing fluid, formation water, and completion fluid. After the end of the fracturing operation, according to the on-site condition and length of time, it is decided that the full diameter of the wellbore can be realized without or with a small amount of drilling operation, so as to save construction costs, avoid the risk of downhole operation, and realize the single-well production in advance. Our Services For more information, you can contact me : Looking forward to cooperating with you!