Payment Terms:
TT/Cash after SGS and other document verification
Destination:
India
Looking for suppliers from:
Worldwide except India, Pakistan
Product Description
Please provide a quotation to the following requirement from importer -
Product: Electrolytic Copper Cathode And Copper Cathode
Specifications:
Qty: 500 Mt As Trial Then 3000 Mt Monthly
Note: If Goods Are Available At Seller's Local Warehouse We Will Use Our Own Transportation, I.e - Ex-factory Deal.
Buyer is interested to receive quotations for the following RFQ -
Product Name: Copper Cathodes (Cu)
Specifications:
Purity : min 99.9935%,
conforms to BS EN 1078:1998(CU-CATH-1), or GB/T 467-2010-CU-CATH-1, please specify LME registered or not registered.
5) Country of Origin: DRC / others
6) Port of Loading: Dar es Salaam/others
7) Total Quantity: 18000mt.
8) Shipments: 100MT for trial order, 1,500MT per shipment after trial order and confirmation.
9) 1000mt per shipment for 12 times.
10)Packing: fastened on pallets by steel bands which can burden weight when lifted by hook and crane during transportation.
11)Destination Port: ASP PRC. China. 1
12)Delivery Terms: Direct Shipment from origin to the seaport designated. No transshipment is allowed.
13)Shipments: 20/25 days after Issuance of the DLC.
14) Inspection: SGS or CCIC or other first Class independent surveyor company inspection at loading port on Sellerâ??s cost, and CIQ inspection at discharge ports burdened by Buyer. The CIQ certificates of quality and quantity at the discharging port shall be final and prevail.
Terms of Payment:
1. Trial Order: By TT, 15% after signing of SPA, 15% against SGS certificate and Bill of Lading, and balance 70% after receiving the full set of Original Shipping Documents as requested in DLC and CIQ Quality certificate and Quantity certificate at discharging port.
2. Main Order: Buyer shall issue an Irrevocable, Transferable Documentary Letter of Credit (abbr. DLC) via MT 700/701 within 7-10 days after the trial order is finished and the main order is confirmed. The DLC shall be payable against the full set of Original Shipping Documents as requested in the DLC and CIQ Quality certificate and Quantity certificate at the discharging port.
Please provide a quotation to the following requirement from importer -
Product Name: Copper Cathodes
Specifications:
As Per Seller’s Offer
Price: USD 6.000 CIF Shanghai port PR of China
Amount: 30 000 MT + 12 x 50 000 MT
Origin: Seller’s option not Russia, not China
Transaction mode
and Payment: LC 2 % PB
Validity: 5 Banking days from issuing
Specifications:
Cu Content and Impurities Item
Cu (Copper) Cu 99.96% or above Percentage (%) or PPM Notes
O (Oxygen) 0 PPM
S (Sulfur) Less Than 4 PPM
Fe (Iron) Less Than 2 PPM
Ag (Silver) Less Than 10 PPM
Pb (Lead) Less Than 0.2 PPM
Ni (Nickel) Less Than 0.2 PPM
Se (Selenium) Less Than 0.3 PPM
Sb (Antimony) Less Than 0.1 PPM
Si (Silicon) Less Than 0.3 PPM
Co (Cobalt) Less Than 0.2 PPM
As (Arsenic) Less Than 0.1 PPM
Bi (Bismuth) Less Than 0.1 PPM
Mn (Manganese) Less Than 0.1 PPM
Te (Tellurium) Less Than 0.05 PPM
Al (Aluminum) Less Than 0.5 PPM
Mg (Magnesium) Less Than 0.4 PPM
Radiation Less Than 0.4usv
Other element content: Shall be set to pass the import regulations at destination country with no harmful elements.
PROCEDURE
1. Buyer issues and send ICPO with seller procedure inserted in the buyer’s ICPO.
2. Seller issues Sales and Purchase Agreement (SPA)
3. Buyer reviews and countersigns Sales and Purchase Agreement (SPA)
4. Seller and Buyer Sign NCNDA/IMFPA, with all Parties Involved.
5. Seller issues to Buyer Partial Proof of Product (PPOP) documents, via E-mail as listed below and seller is
responsible for to cost of issuing PPOP document.
• Export License.
• Commitment Letter to Supply.
• Certificate of Origin.
• Legalized & Notarized Contract.
• Statement of Product Availability
6. Buyer’s Bank shall issue Transfer SBLC MT 760, DLC MT700 for 100% of the value of first
shipment to seller nominated Fiduciary Bank Account outside Kazakhstan according to approved
Verbiage, and scanned copy of issued instrument must be send to seller for confirmation
Note: If buyer fails to issue DLC MT 700 within (7) working days, ). Seller appoint a
shipping company for buyer, both Seller and Buyer sign Charter Party Agreement with shipping company.
Seller pays 50% of shipping cost and buyer pays 50% to the shipping Company in advance before the
loading of the product commence. Buyer payment will be deducted from the total volume of the shipment
after quantity and quality at buyer’s destination port
7. Upon receipt of buyer DLC MT700 instrument as Guarantee, seller issue to Buyer’s
bank full Proof of Product (POP) as full Shipment documents, include 2% Performance Bond to buyer’s
bank, through seller nominated bank.
8. Loading commence as shipment schedule and seller release to Buyer the full set of POP Documents
and 2% PB (Performance Bond) by Bank to Bank.
Payment Terms:
100% Non-Transferable, Irrevocable LC relaced at destination after SGS PB: 2% for the entire orders
Destination:
Shanghai Port, China
Looking for suppliers from:
Worldwide
Product Description
Please quote for the following wholesale product requirement -
Product Name: Electrolytic Copper Cathode
Specifications:
Purity: No Less Than 99.99% - Rejection
Purity: No Less Than 99.99% - Rejection 99.97% Origin: Chile, Peru, Congo, Zambia, Kazakstán Etc. Quality: Electrolytic Copper Cathode Grades A Purity 99.99% - Rejection 99.97% Conforming To The Lme Dimension: 914mm X 914mm X 12mm (appr.
Qty: Total Quantity: 121,000 Metric Tons Duration: Twelve Months (12 Months)
Quantity Required : 121000 Metric Ton/Metric Tons
Shipping Terms : CIF
Destination Port : Shanghai Port, China
Payment Terms : 100% Non-Transferable, Irrevocable LC relaced at destination after SGS PB: 2% for the entire orders
Please provide a quotation to the following requirement from importer -
Product Name: Copper Cathode
Specifications :
Cu 99.99% Purity
Quantity: 200 Metric Tons For Start & Later 3000 Metric Tons
FOB At Loading Port Or CIF China
Quantity Required : 3000 Metric Ton/Metric Tons per month